7.2.3 Previous Payment or Use <br />In calculating the credits given under this section, the Eity Engineer shall apply credit only <br />to the developments for which the previous use or payment can be verified. Credit far <br />previous use will be based on the last known verifiable use and the burden of proof is on <br />the applicant to provide adequate documentation. <br />7.2.3.1 Pre-existing Development Credit <br />When an applicant for development of vacant land establishes that the land was <br />previously improved with structure(s) which were demolished within 5 years of the <br />application, a reduction for the demolished structure(s) shall be granted provided <br />a reduction for the demolished structure(s) has not been previously given. <br />7.2.4 City Cost of Construction Credit <br />In calculating the credits. given under section 7.2.1 and 7.2.2, the City Engineer shall <br />estimate the cost of the capital improvement based upon what the City would pay were it <br />to construct such improvements. <br />7.2.5 Revenue Collection for Equivalent Assessment or Special Benefit Credit <br />When an equivalent assessment or a .special benefit assessment is collected when <br />property connects to a public improvement for which the City has granted a credit under <br />7.2.2 (3) above, the revenue collected (net of the costs of collection) shall be deposited in <br />the SDC fund for the system to which connection was made and for which the credit was <br />given unless the SDC fund has been reimbursed for the credit from other City funds. If the <br />SDC fund has been reimbursed in advance from other City funds, the revenue collected will <br />be deposited to the City fund which. reimbursed the SDC fund. <br />7.3 Revocation of Credit and Impact Reduction <br />A credit or impact reduction which has been applied to reduce SDC fees may be revoked and the <br />unpaid portion of the SDC reimposed as a lien against the property, within the time required by <br />-these Methodologies, if: <br />(1) The associated capital improvement for which SDC credit has been given is not constructed <br />or completed as required, or fails to function as designed; or <br />(2) .The associated reduction program for which an impact reduction has been approved is not <br />instituted or is modified without the approval of the. City Engineer, or ceases to function as <br />designed. <br />Such revocation shall not occur until ten days prior written notice has been given to and an <br />opportunity to be heard afforded the permittee and property owner. If the credit or impact <br />reduction is revoked, the City Manager may add to the amount due, the cost of the revocation <br />proceedings. <br />May 1, 1997 City of Eugene SDC Methodology Page 12 <br />