7.1.2.1 StormwaterSystem Impact Reduction Criteria <br />Criteria for Stormwater SDC impact reduction for. development can be found in <br />..Appendix E, Section 6.0. A development that meets the required criteria will be <br />eligible to receive a reduction against Stormwater SDCs at the time of permit <br />issuance as follows: <br />SFD and Duplex Residential development: <br />a .100% flat rate Stormwater SDC impact reduction for complete containment of <br />all on-site stormwater, with no direct or indirect connection to the public system; <br />or <br />50% flat rate Stormwater SDC impact reduction for any amount of partial <br />containment of runoff on-site. <br />Multi-family Residential, Commercial, Industrial, other development using a common <br />or shared facility: <br />~ The Stormwater SDC will be reduced in the same proportion that the mitigating <br />facility reduces ,runoff leaving the fully-developed. site. <br />7.2 Credits <br />City approval of credits shall be given based on one or more of the following: <br />7.2.1 Qualified Public Improvement Credit <br />For any qualified public improvement as defined in Eugene Code, to be constructed in <br />connection with the development for which an SDC is collected. <br />7.2.2 Capital Improvement Credit <br />For any capital improvement. as defined in Eugene Code, to be constructed as part of a <br />development to the extent: <br />(1) that it reduces the need for constnaction of specific, identifiable public improvements; <br />or <br />(2) that it would otherwise have to be constructed or acquired at public expense and is <br />eligible for funding with Systems Development Charge funds under the current <br />policies of the City Council; <br />or <br />(3) that the City can recover credits through collection of an equivalent assessment from <br />benefitted properties, or for which the City Council has formed a Local Improvement <br />District in accordance with provisions in Eugene Code 6.610 (6) or 7.407 (3). <br />May 1, 1997 City of Eugene SDC Methodology Page 11 , <br />__ <br />