ry, <br />4.0 Local {City) and Regionat (MWMC) Wastewater Systems <br />4.1 'Local (City) Wastewater System <br />The Local Wastewater SDC formula for calculating each element -and application of the- <br />WastewaterSDC is determined by multiplying the applicable rate per EDU or PFU or historic <br />consumption or building site/loYsize, by the unif of measure for the proposed development. The <br />Local Wastewater SDC is applied differently `to development outside and inside the River <br />Road/Santa Clara/Highway 99 Area (see .Attachment. 2 in Appendix D). The detailed analysis, <br />methods for calculating, and the.. Cost of. Service formula per EDU or PFU for the Local <br />Wastewater system can be found in Appendix D. <br />The Local Wastewater SDC for a proposed development outside the River Road/Santa <br />Clara/Highway 99 Area is determined based on: <br />` D Dwelling Units (DU) for Single Family and Duplex development <br />~ Plumbing Fixture Units (PFU) for other than Single Family and Duplex- development (e.g. <br />Multifamily, Commercial, Industrial) <br />The Local Wastewater SDC for an existing; :development outside' the River Road/Santa <br />Clara/Highway 99 Area connecting to the wastewater system for the first time is determined <br />based on: <br />` a Dwelling Units (DU) for Single Family and, Duplex development <br />D Historic Consumption (monthly average winter water consumption) for development <br />other than Single Family and Duplex development {e.g. Multifamily, Commercial, <br />Industrial) <br />The .Local Wastewater SDC inside the River Road/Santa Clara/Highway 99 Area for all <br />development types (e.g., commercial, :residential, etc.), new or existing, incorporafed or <br />unincorporated, is based on: <br />D River Road/Santa Clara/Highway 99 Area rate -Local. Wastewater SDC. Charge (based <br />on square footage of the building site or lot) <br />4.2 Regional (MWMC) Wastewater System. <br />The City of Eugene entered into an Intergovernmental Agreement with the City of Springfield and <br />Lane County which established the Metropolitan Wastewater Management Commission.. On <br />'November 26, 1990, the Commission adopted the Regional Facility Equalization Charge which <br />includes a regional administrative charge. In accordance with the agreement, the City of Eugene. <br />must adopt rates and .charges not less than those required by the Commission. <br />The Regional Wastewater SDC is applied by'the same method. to development regardless of <br />..location either outside and .inside the River Road/Santa Clara/Highway 99 Area. The Regional <br />..Wastewater -SDC formula for calculating :each element and application of the Regional <br />Wastewater SDC is determined by multiplying the applicable rate per EDU or PFU or historic <br />consumption; by the unit of measure for the proposed development: The SDC charge wiN be <br />based on the .greater of calculations using either the City methodologies or the current MWMC <br />Equalization Fee as adopted by the MWMC Commission.. The Regional Wastewater system Cost <br />of Service formula per DU or, EDU or PFU can befound in.Appendix D. <br />March 01; 1997 Methodologies: City of Eugene SDCs. Page 8 <br />