<br />2.2.1. Administrative Costs <br />An administrative charge shall be included in each SDC imposed.:' This charge is to recover <br />- direct and indirect costs incurred in complying with the requirements of stafe law and the <br />'cost of administering the SDC. These costs include periodic and on-.going annual costs. <br />.Total annual administrative costs are estimated annually. These costs will be recovered <br />through a charge calculated as a percentage rate as listed in the SDC fee schedule'in, <br />.Appendix G. The percentage is multiplied by the total of the system-specific charges for <br />each development before applying any exemption or credit to determine the administrative <br />charge. <br />2.2.1 Maximum Administrative Charge <br />An administrative charge calculated shall not exceed a maximum amount of $30,000,00 for <br />a single permit issued. If multiple permits are .issued for different phases of the same <br />development, the maximum administrative charge .shall be applied to each permit <br />independently. _ <br />2:3 ,Annual Adjustment to SDC <br />2:3.1 Inflation Adjustment For All City System Charges <br />Because the SDC and supporting calculations including the. credits established herein are <br />.closely related to the cost of construction of the' capital improvements for each of the <br />systems, except as provided. in paragraphs 2.3.2 and 2.3.3 hereof, the SDC and <br />calculations for each-City system shall be adjusted annually during the month of July of <br />each calendar year unless otherwise amended as provided herein. Excepf..when the <br />- charge or credit is determined by another provision of the Eugene Code, 1971, the City <br />Engineer shall make. the adjustment based upon current project costs, the National <br />Construction Cost Index published by Engineering News Record (ENR), and other local or <br />regional data. The supporting. documentation,, tables, and figures will be part of the annual. <br />adjustment process and wiA be updated without administrative notice or hearing, by the City <br />Manager or manager'sdesignee. <br />2.3.'2 Inflation Adjustment For Regional System Charges <br />The Regional Facilities Equalization, charge established in cooperation with the .MWMC <br />shall be adjusted from time to time to-allow for inflation, after consultation with MWMC <br />without notice or hearing by. the City Manager or manager's designee. <br />2.3.3 inflation. Adjustment For River Road/Santa Clara/Highway 99 Area City <br />System Charges <br />The Local Wastewater System portion of the ,Wastewater ;System charge for River <br />Road/Santa ClaraJHighway 99 Area shall remain. at 2.5 .cents per quare foot of parcel <br />being developed, whether; or not the property is incorporated into the City, until modified by , <br />amendment of these Methodologies:. Attachment #2, in Appendix D, the River Road/Santa <br />' Clara/Highway 99 Area -City Wastewater SDC.. Rate map, shows the, specific areas that <br />are eligible for this alternate SDC calculation method. <br />March 01,' 1997 Methodologies:. City of Eugene SDCs 'Page 6 <br />._ <br />