New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-97-02-F-1
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-97-02-F-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 10:25:05 AM
Creation date
6/3/2009 9:12:08 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC
Document_Date
3/12/1997
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t <br />{-43:4] 3.3.3.4 Specifications For Traffic' Study Design. <br />The traffic study, shall be designed in accordance with the methodology <br />described in the Institute of?ransportation Engineers Trip Generation Manual, <br />current edition. <br />f43~5j 3:3.3 5 Spe~ifc~tlans For Descr~~~~pn and Drawings; <br />The request to use the Altemate calculation shall include a detailed description <br />and drawing of the proposed development site, a description and drawing of <br />each sampling site, a description of why these sites are representative of the <br />impact likely. to be generated by the proposed development anal such other: <br />information as may be required by the City's Traffic Engineer; <br />6j 3 3 X3:6 Specit'Scattons For Repark F~itimat <br />The completed report of the study shall. be irr a form approved by the City's, <br />Traffic Engineer and upon its completion shall be submitted to the City's Traffic <br />. _ Engineer for approval. <br />~' <br />{4~5j 3.3.4 Approval and Outcome of Alternate Calculation Traffic Study <br />The City's Traffic Engineer may approve, approve with .conditions. or reject the trip <br />generation rate calculated. in a report prepared under paragraph-[-~3j ~*;~ hereof. Upon <br />approval the trip rate for the proposed development shall be :used to calculate the <br />transportation SDC. In the event that the Altemate Calculation results in a transportation <br />SDC less than the Standard Calculation, upon approval of the Altemate Calculation by _ <br />the City Traffic Engineer, .the City shall-refund the excess transportation SDC collected <br />to the applicant or reduce the amount the applicant agreed to pay. If the .approved <br />Alternate Calculation results in a transportation. SDC greater than the Standard <br />Calculation, the applicant shall pay the underage. to the City or modify the agreemen# to <br />pay to include the underage. In the event the applicant fails to promptly pay .the <br />underage to the City or to promptly modify the agreement to pay, the City may suspend <br />the permit for the development until payment is made or the. agreement to pay is modified <br />to include the underage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.