Attachment #7 of Exhibit A <br />Administrative Order No. 58-97-07 <br />Page 6 of 8 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />eanor,g ' <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />2.3 Change of;Use. <br />When a change';of use of an existing development resin#ts in an increased irnpaet on <br />the;regional was#ewater faci#ities (as demonstrated by calcu#ating the SDC for both <br />uses), #he`SDC wi## be charged on the increased impact_ This is determined by <br />ca#cu#ating what the development's-charge wou#d be for the current use, and for the: <br />proposed use. #f the proposed use wou#d result #n a higher charge, the difference is <br />co#tected., <br />Proposed: July 7, 1997 City of Eugene SDC Methodology Page D-11 <br />