New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-97-07-F (3)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-97-07-F (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 10:32:32 AM
Creation date
6/3/2009 8:38:50 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC
Document_Date
4/28/1997
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Attachment #7 of Exhibit A <br />Administrative Order No. 58-97-07 <br />Page 5 of 8 <br />2:2:1 Process Wastewater <br />Th'e MWMC SDC for development that discharges process wastewater to the <br />wastewater system will be charged on the basis of the strength of that discharge. The <br />rates per FEt3 for land uses listed irr Attachment 4 of this Appendix include process <br />wastewater charges. For uses not otherwise: listed in Attachmen# 4 that include <br />process wastewater, the MWMC SDC will be calculated by combining the charge for <br />unit of development for general Indus#rial uses, and adding the charge for the; process <br />wastewater FEU that ma#ches the strength of the proposed discharge. The strength <br />classes shown in Attachment 4 are the same strength .classes used by MWMC in the <br />user fee system.; <br /> <br /> <br />-~3} 2.2.2 Regional Wastewater SDCs For All fAthert] New Development <br />with Annual Average Daily Flow Equal to or Greater than 100,000 <br />Gallons, and for Existing Development Jncreasing Flow by or Greater <br />than 100,000 Gallons per Day <br />Before calculatir>•g the SDC for any;;devefopment with an anticipated discharge of <br />10,000 gallons or more of sewage per day, the Executive Officer'of the MWMC (EO} <br />shall examine the developments impact on the'twenty :year schedule of capital <br />projects. ` if one or more capacity.-increasing projects will move into the 5 year CIP as a <br />result of the development, the E~ will es#ablish new unit costs (based oil the #ofal <br />costs of the amended'S-year CIP};upon which SDCs for a[{'development will be <br />calculated. If the MUVMC SDC rate is modified,: the modified fee wiN be applied to the <br />development that caused the need for the modification and to all future development <br />Proposed: July 7, 1997 City of Eugene SDC .Methodology Page D-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.