Attachment #7 of Exhibit A <br />Administrative Order No. 58-97-07-F <br />Page 3 of 6 <br />FIGURE 5 <br />MWMC V1/astewater System <br />Existing System Value <br />Level .of Service Future System <br />.Present value ~/alUe . <br />.Impact measurement (minus) <br />~ Flow- gallons per day Liabilities, grants, and Impact measurement <br />outstanding-debt Future value of <br />BOD -pounds per day capacity-increasing projects. <br />~ SS _ pounds per day (equals). from CIP <br />Local equity <br />Formulas: <br />Unit Cost of Capacity <br />(A11 component. costs are added to determine the unit impact per FEU land use) <br />The cos€ of existing plus future system values <br />allocated to average and peak flow <br />= Cost per gallon of daily flow <br />Design flow <br />The cost of existing plus future system values <br />allocated to Biochemical Oxygen Demand <br />- =Cost per pound of daily BOD <br />Design BOD capacity <br />a <br />The cost of existing plus future system .values <br />allocated to Suspended Solids <br />_-.Cost per pound of .daily SS <br />Design SS capacity <br />OTE: The' cost per unit of Flow; BOD, SS can be found in the current adopted SDC fee schedule in Appendix G. <br />July 7, 1997 City of Eugene SDG Methodology Page, D-8 <br />