New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-97-08 (2)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-97-08 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 10:33:26 AM
Creation date
6/3/2009 8:25:19 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
ROW
Document_Date
6/5/1997
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The request for an annual permit will be reviewed and approved, approved with condi- <br />tions, or denied. Annual permits are subject to revocation if a facility owner fails to comply <br />with the standards established by the City or conditions of the permit. <br />Permit fees for annual permits include a processing component and a "per activity" <br />component. The permit processing component is payable upon approval of the annual <br />permit. The "per activity" component is calculated monthly or periodically, .based on the <br />number of right-of--way cuts performed under the annual permit, and billed to the permit- <br />tee. <br />2.C REVOCABLE PERMITS FOR PRIVATE FACILITIES <br />A revocable permit may be issued to a permittee for any use of the public way which is not <br />administered by an existing franchise or license. As with all right-of--way permits, the City <br />reserves the right to "revoke" or cancel the permittee's permission to use the public way at <br />a later date. This #ype ofi permit is typically used for placement of a private facility that <br />serves an individual property, site, or business and is not placed for the provision of <br />services to others. Detailed questions concerning revocable permits should be addressed <br />to the Engineering Division personnel <br />Unless otherwise specified in a license or franchise agreement, a revocable permit shall <br />be obtained prior to the placement of any private facility upon, over or under the public <br />way. The permittee shall be required to pay all permit fees and user fees as established. <br />Issuance of a revocable permit does not relieve the permittee from obtaining any <br />other permits which may be required. Examples of other permits which may be <br />required are building, right-of.--way cut, tree removal, and sewer connection. Any revoca- <br />ble permit which entails excavation within the public way shall also require aright-of--way <br />cut permit. <br />Revocable .permits issued which involve the placement of underground facilities shall <br />include the requirement for the permittee to subscribe to the Oregon Utility Notification <br />Center and to respond to requests from underground excavators for the field ..location of <br />the permittee's facilities. Failure to maintain this subscription may result in the permit <br />being revoked. <br />Revocable permits shall be subject to all standards for temporary traffic control, construc- <br />tion practices, and right-of--way restoration included herein. <br />2.C.1 Application <br />Application to use the public way under a revocable permit may be made #o the staff of the <br />City Engineer at the Permit and Information Center at 99 West 10th Avenue. <br />Utility & R/W Permit Policy 8 06/01/97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.