New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 97-09-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 97-09-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 10:49:55 AM
Creation date
6/3/2009 8:23:39 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
ROW
Document_Date
6/30/1997
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
w ~ .y .. <br />Right-of-Wav Cut Permit Fees: <br />Annual "Blanket" Permits: <br />Processing $400.00 per permit <br />Inspection $ 50.00 per each. <br />Provider activity <br />.Individual Permit Costs: <br />Joint trench ~ 1 Facili 2 Facilities 3 Facilities 4 Facilities <br />Street Type local arterial local arterial local arterial local arterial' <br />.Projects less than 100 ft. $165 $200 $100 $120 $80 $95 $70 $85 <br />Projects from l00 to 499.ft. $210 $255 $125 $155 $100 $120 $85 $105 - <br />Projects from 500 to 100 ft. $275 $335 $165 $200 $125 $155 $110 $130 <br />Projects 1000 ft. and greater $360 $450 $215. $265 $165 $205 $140 $175 <br />Notes: <br />1. Costs designated are for each facility within the joint trench. <br />2. The .option of applying for an annual blanket permit is only available to Providers Franchised. or <br />Licensed by the Ciry. <br />3. Providers have .the option of obtaining individual right-of--way cut permits for each. excavation.. <br />activity performed within the right-of-way or of obtaining an annual blanket permit which covers <br />many activities associated with maintenance and minor installations within the. right-of-way. The <br />regulations pertaining to the annual blanket permit program are contained within the administrative . <br />rules R-7.302-A-2. <br />4. Individual Permit Costs for collector streets and alleys are to be charged the same as local streets. <br />5. Individual Permit Costs for Public Utility. Easements (PUE) abutting street right-of--way shall be <br />charged at the same rate as if the placement had been in that right-of--way. PUEs not abutting <br />street right-of--shall way shall be charged at the rate for local streets. <br />6. The intended meaning of the term "facility"in the proposed fee schedule is that each .facility -type, <br />e.g. electric, water, or telecommunication facility, under a single provider's ownership and <br />installed under a single project/permit shall be considered a "facility" for purposes of calculating <br />permit fees. <br />Other: <br />Exception permit for cutting street less than five years old $1,000.00 <br />Exhibit A - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.