:. <br />industrial Pretreatment Program Fees <br />Annual discharge permit <br />~ Mobile. waste hauler initial application and <br />permit. (up to two year term) <br />Mobile waste hauler biannual permit renewal <br />(must be submitted at least 90 days prior to <br />expiration of current term) <br />.Application to discharge contaminated <br />groundwater. <br />Application to discharge trucked <br />industrial waste <br />Grease trap waste surcharge (from grease <br />trap of over 50 gals capacity) <br />Appeal from imposition of administrative penalty <br />(to be refunded. if appellant prevails on appeal) <br />Fee for recovering the City's costs involved in monitoring <br />and resampling permittees who have exceeded a permit <br />limit shall be computed on the basis of the hourly wage <br />', ~ then in effect for the personnel performing the service, <br />~. plus 10 % for administrative overhead, together with <br />laboratory costs and expenses. <br />Application fees are nonrefundable. <br />The above fees do not apply to City owned or operated vehicles. <br />$360.00 <br />$250.00 <br />$ 75.00 <br />$125.00- <br />$125.00 <br />$10.00 per load <br />$ 75.00 <br />