Administrative Order 58-00-06 <br />Exhibit A <br />Findings for <br />Administrative Order No. 58-00-06 <br />of the <br />Traffic Engineer of the City of Eugene, Oregon <br />Closure of Fairway Loop south of Eastwood Lane <br />Background <br />As late as the 1950's and 1960's, Coburg Road and the Ferry Street bridge served as a link from <br />downtown Eugene to the town of Coburg to the north. Coburg Road has passed through a sparsely <br />populated area of Lane County located between the Willamette and McKenzie Rivers that has since <br />become known as the `Willakenzie' or `Ferry Street Bridge' area. In the mid 1960's the Willakenzie <br />area began to experience a period of development and growth which coincided with the construction <br />of Interstate 105 which occurred in 1966-68. <br />Initially constructed as the intersection of an interstate highway and relatively rural roadways, the <br />intersections of I-105 and Coburg and Country Club Roads were designed to function under an <br />entirely different set of circumstances than what exists today. The eastbound to northbound <br />movement from I-105 to Coburg Road was intended to leave I-105, pass under the north end of the <br />Ferry Street bridge structure and access Coburg Road at what is now the intersection of Coburg and <br />Centennial. <br />Many motorists have found this movement to be difficult and inconvenient and have chosen to <br />access the Willakenzie area via Southwood and Fairway Loop to Eastwood, Westwood, or Fairoaks <br />Drive. This cut-through pattern by as many as 3,000 vehicles per day has led to numerous <br />complaints from residents of the area and repeated requests for the city Transportation. Division to <br />solve the problem. The city made an attempt to address the situation in 1977 with the unsuccessful <br />installation of a test full traffic diverter. A compromise solution, one-way half-diverter, was <br />eventually reached that failed to address the crux of the problem, but reduced the cut-through to <br />northbound only. The city's response has consistently been that the short-term options have been <br />limited and along-term solution must be incorporated into the Ferry Street bridge project. <br />The development of the final design for the Ferry Street bridge and associated revisions to the street <br />network of the area produced a new roadway (Cedarwood) between I-105 and the Honda/Acura auto <br />dealership which provides direct access to northbound Coburg Road for eastbound motorists exiting <br />I-105 or traveling southbound on Country Club Road. This new route provides a positive alternative <br />for the traffic that has been cutting through the neighborhood and enables the City to pursue the <br />planned closure of Fairway Loop. <br />Page 3 of 9 <br />