New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Orders 58-00-06
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Orders 58-00-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 10:52:00 AM
Creation date
6/2/2009 11:30:43 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Street Closure
Document_Date
2/8/2000
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Fairway Loop Connector road (Southwood Lane) was constructed to provide a link <br />'. = between Coburg Road and Country Club Road <br />\ NOW, THEREFORE, <br />Based on the above findings; the findings contained in Exhibit A attached hereto and <br />incorporated herein by reference, the authority contained in section 5.040 of the Eugene <br />Code 1971, and the delegation order of the City Manager, the Traffic Engineer of the City <br />of Eugene orders that: <br />Fairway Loop shall be closed to through traffic at a point approximately 300 feet <br />south of the centerline of Eastwood Lane. <br />2. Pedestrian and bicycle access shall be provided through the barricade. <br />3. This order shall take effect on the date the. signs and barricades are installed. <br />Dated this ~~~ Day of February, 2000 <br />Gary L. ke, P.E., City Traffic Engineer <br />Paget of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.