'~~ $31;345;000 + $6,170;000' <br />49,000,000 <br />_ $0.766 (per gallgn of average'daily peak flow) <br />$1..3,850;000 <br />_ $209.85 (per pound of t~iochemical oxygen demand). <br />66,00.0 <br />$11,663,000 <br />_ $.162.8.9 (peg pound of suspended solids) <br />..71,600 <br />1.4 Stormwater System Cost of Service: <br />Formulas: <br />SDC eligible costs <br />= Cost per impervious acre <br />Acres of'imperuious surface <br />Cost per impervious acre <br />= Cost per square foot of impervious. surface <br />Square feet per acre <br />Calculations: <br />$54, 333,414` <br />_ $6,905.62 (cost per impervious acre) <br />7,868 <br />$6, 905.62 <br />$0.159 (cost per,mpervous square foot).. <br />43,560 <br />1.5 Parks System Cost of Service: <br />City of Eugene SDC Methodology Fee Schedule & Formulas, Page F-5 <br />