System Valuation (value of existing + value of planned) <br />Build-out Capacity (mgd) _ ' Cost per Unit of Capacity; <br />Per unit of capacity'x flow!per PFU for development type x number of PFUs for development <br />SDC charge for development <br />Calculations for Non-Residential Development: <br />$87.241 M + 8.609 M __ <br />_ $1.96 per gal/day <br />48.9 mgd <br />$1.96 xGal/PFU (varies. by development type) x number of PFUs <br />SDC 'charge for development <br />1.3.2 Regional (MWMC) Wastewater System Cost of Service <br />Formulas: <br />Existing and increased' plant Local <br />Equity related to average flow Cost per gallon of <br />= average daily flow <br />Average daily design flow <br />Existing and increased) plant Local <br />Equity related to peak flow Cost per'gallon of <br />= peak daily flow <br />Average daily design flow <br />Existing and .increased plant Local Equity <br />related to otai suspended solids Cost per pound <br />= of suspended solids <br />Design suspended solids <br />Calculations: <br />$16,037,000 <br />_ $0.327 (per gallon of'average daily flow)_ <br />49;000,000 <br />City of Eugene SDC Methodology Fee Schedule & Formulas, Page F-4 <br />