EXHIBIT A (page 6 of 6) <br />2.0 Adopted SDC Fee Schedule: Current Rates <br />2.1 Transportation System <br />Cost per trip : ............................................ $665.49 <br />2.2 Local Wastewater System: <br />Equivalent Single-family dwelling unit (EDU) ...................... $560.58 <br />Per Plumbing Fixture Unit (PFU) [ 560.58 / 16 ] .................. $35.04 <br />For Historic Consumption, per 1,000 gallons <br />of average monthly winter water consumption [ $560.58. / 6 ] ........ $93.42 <br />River Road/Santa Clara/ Highway 99 Areas: <br />Per square foot of tax lot area ............................... $0.025 <br />2.3 Regional Wastewater System: <br />Unit Cost by Component: <br />Average Flow (per gallon) .................................. $0.317 <br />Peak Wet Weather Flow (per gallon) .......................... $0.745 <br />Biochemical Oxygen Demand (per pound)) .................... $202.94 <br />Suspended Solids (per pound)) ............................. $157.53 <br />2.4 Stormwater System: <br />Per Single Family Dwelling: <br />With building footprint < 3,000 sq. ft . .......................... $475.74 <br />(Assumes 9,200 sq ft lot; .35 impervious surface) <br />[ 9,200 x 0.35 = 3,200 x 0.148 = $476.00] <br />With building footprint >_3,000 sq. ft. or more ................... $713.61 <br />(Assumes 1,5 x SFD average impervious surface) <br />[ $475.74 x 1.5 ] <br />Per Duplex (equals two Dwelling Units) ............................ $951.48 <br />Per Manufactured Home Development: <br />Per space in the development .............. ............... $249.23 <br />(Assumes 1,684 sq. ft. per space x $0.148) <br />plus per square foot of impervious area for other features .......... $0.148 <br />All Other Development: <br />Per square foot of impervious/equivalent impervious area. ......... $0.148 <br />2.5 Parks System: <br />Total charge per person .................................... $362.36 <br />Total charge per Dwelling Unit (2.3 persons x.$362.36) .... _ ....... $833.43 <br />2.6 Administration Fees: <br />City of Eugene per total SDC charges ......................... 5.0% <br />(Based on the gross SDC charge) <br />MWMC per permit application .................... . .......... $10.00 <br />2.7 Appeal Fee: <br />City of Eugene per SDC appeal .............................. $100.00 <br />City of Eugene SDC Methodology Page G-6 <br />