New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2000-05 Eugene CIP Draft
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2000-05 Eugene CIP Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 12:26:34 PM
Creation date
6/1/2009 12:32:36 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
11/30/1998
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Stormwater -Six-Year Funded Program Stormwater -Six-Year Funded Program <br /> Pilot Projects Identify, design and construct facility(ies) to treat and enhance stormwater quality as Delta Ponds Enhancements • City Match Multiobjective project <br />to match grant funding and support volunteer projects to <br /> well as implement new techologies and approaches within the municipal separate enhance recreation, stormwater quality and habitat of Delta Ponds. Includes <br />levee <br /> stormwater conveyance system. repairs, removal of invasive species, pond deepening, and pond lining. Only the <br /> PIanlPolicy Document: Comprehensive Stormwater Management Plan, Natural approximate City match is shown. Total cost is unknown at this time, city share <br />is 35°k <br /> Resources Functional Plan oftotal. <br /> Total Project Cost: $200,000 PlanlPolity Document: Natural Resource Assessment for Delta Pond, Parks & <br /> Recreation Plan <br /> Total Project Cost: $400,000 <br /> Polk StreetOutfall Retrofitoutfallforwaterqualiryimprovements. <br /> PlanlPolicy Document: CSWMP <br /> Kinney Park Channel Restoration Restore abandoned channel in Kinney Park, south of Martin. <br /> Total Project Cost: $50,000 <br /> PIanlPolicy Document: <br /> Total Project Cost: $87,000 <br /> River Avenue to Division Storm System Replace 960' of 36" concrete pipe with a 72" pipe from River Avenue to Beltline. <br /> PIarJPolicy Document: Drainage Master Plan <br /> Lower Amazon Creek Restoration Modify and remove Amazon Creek levees between Southern Pacific Railroad and <br /> Total Project Cost: $400,000 Royal AvenuelGreenhillRood to mitigate environmental and habitat impacts of original <br /> facility construction. Restores adjacent wetlands and connects the creek to the flood <br /> plain. Project 1135 is managed by the Corps of Engineers. The City, as a local <br /> sponsor, would finance 15°k of the total cost of the project. The City will fund <br /> Riverview Street Stormwater Increase pipe capacity in Riverview Street north of 26th, from manhole 53783 to reconstruction of levee on Amazon Creek, just south of <br />project area, to maintain <br /> manhole 66483. Design in FY 2000 in conjunction with Augusta Stormwater Capacity upstream water levels. <br /> Enhancements, construction FY 200E <br /> ~ PIanlPolicy Document: West Eugene Wetlands Plan, Comprehensive Stormwater <br /> PIanlPolicy Document: Management Plan, Natural Resources Functional Plan <br /> Total Project Cost: $88,000 Total Project Cost: $35,000 <br /> Storm System: Division Avenue N. 400' Replace 400' of 36" concrete pipe with a 72"pipe north of Division Avenue in Santa Upper Amazon Creek Conceptual Plan Develop <br />conceptual plan for the enhancement of the Upper Amazon Creek. Project <br /> Clara to address existing deficiency in capacity. construction, estimated at $4,000,000, is unfunded at this time <br /> PIan/Policy Document: Drainage Master Plan PlanlPolicy Document: CSWMP, Parks Master Plan <br /> Total Project Cost: $175,000 Total Project Cost: $29,000 <br /> Wetland Mitigation Bank Enhancement, restoration andlor creation of wetlands on various sites in West Eugene <br /> <br /> Restoration to continue the mitigation bank. Mitigation work in advance of development will <br /> result in certified credits to be sold to developers. <br /> Amzn Crk Enhncmnt, Oak Ptch•Acrn Prk Widen existing Amazon Creek channel and enhance with vegetation for water quality <br /> and natural resource benefits between Oak Patch and Acorn Park. Design in FY 2000, PIanlPolicy Document: West Eugene Wetlands Plan, MOA between City of <br /> acquisition and construction in FY 2001. Eugene, BEM, Corps, EPA, DEQ & DSL <br /> PIanlPolity Document: Total Project Cost: $930,000 <br /> Total Project Cost: $250,000 <br /> New Capital Facilities <br /> Natural Resources Sites Enhancements Public Access parking lots at E2e site and Balboa site. <br /> PlanlPolicy Document: <br /> Total Project Cost: $80,000 <br /> City of Eugene • 1000-2005 Capital Improvement Program City of Eugene • 2000.2005 Capital Improvement Program <br /> Project and Program Areas -Stormwater Project and Program Areas -.Stormwater <br /> 35 36 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.