_ <br /> Stormwater -Six-Year Funded Pro ram <br /> g Stormwater -Six-Year Funded Program <br /> Table of Funded Projects Description of Funded Projects <br /> (Figures in $1000'x) <br /> PreservationlMaintenance <br /> FY00 FY01 FY02 FY03 FY04 FY05 TOtdl Channel Easement Acquisition Acquire right-0f--way andlor easements along drainage channels to facilitate access for <br /> PreservatjOn~Maintenance maintenance purposes. Bike path protection of Stormwater-related natural resources, <br /> t' water quality improvement areas and other facility access rights are secured <br /> Channel Easement Acquisition 1173 700 160 150 150 150 2483 concurrently. Priority acquisition areas are in the Amazon and Willakenzie basins. <br /> Stormwater Rehabilitation/Improvements 501 829 700 750 500 500 3780 ' Examples are the Amazon east headwaters acquisition, Braeburn Creek acquisition, <br /> 1674 1529 860 900 650 650 6263 and Greenhill Tributary acquisition. <br /> Upgrades and CdpdClty EnltanCement PlanlPolicy Document: Comprehensive Stormwater Management Plan, Bicycle <br /> Master Plan <br /> Augusta Stormwater Capacity Enhncmnt 40 260 300 <br /> Awbrey Lane, Open Channel to Enid Rd 60 60 Total Project Cost: $2,483,D00 <br /> Floral HiIVRiverview Stormwtr Imprvmnts 33 217 250 <br /> Hilyard Street, Tugman Park to 36th 160 160 <br /> Stormwater Rehabilitation(Improvemerrts Rehabilitate, reconstruct and install Stormwater systems where needed due to various <br /> Pilot Projects 200 200 problems, such as age-related deterioration, poor materials, localized flooding, and/or <br /> Polk Street Outfall 50 50 system limitations. Where feasible, natural systems are used to address existing <br /> River Avenue to Division Storm S stem problems in conformance with CSWMP. Examples include the Augusta Inlet Retrofit, <br /> Y 400 400 Buck Street at 15th Avenue Stormwater Improvements, Cherry Drive Stormwater <br /> Riverview Street Stormwater 12 76 88 Improvements, and Grassauer Ditch Enhancemnt. <br /> Storm System: Division Avenue N. 400' 175 175 PIanlPolity Documerd: Public Facilities Plan, Comprehensive Stormwater <br /> 445 663 175 400 0 0 1683 Management Plan <br /> Restoration Total Project Cost: $3,780,000 <br /> Amzn Crk Enhncmnt, Oak Ptch-Acm Prk 50 200 250 <br /> Delta Ponds Enhancements -City Match 200 200 400 <br /> Kinney Park Channel Restoration 87 87 Upgrades and CaaacitY Enhancement <br /> lower Amazon Creek Restoration 35 35 <br /> Augusta Stormwater Capacity Enhncmnt Construct a high flow by-pass to reroute high flows from the open waterway <br /> Upper Amazon Creek Conceptual Plan 29 29 downstream of Augusta. Design in FY 2000 in conjunction with Riverview Street <br /> Stormwater, construction in FY 2001. <br /> Wetland Mitigation Bank 180 150 150 150 150 150 930 <br /> 294 437 350 350 150 150 1731 PIanlPolicy Document: CSWMP <br /> New Capital Facilities Total Project Cost: $300,000 <br /> Natural Resources Sites Enhancements 20 60 80 <br /> River Point Pond Outfall 225 225 <br /> Willakenzie Storm Trunk 0 Awbrey Lane, Open Channel to Enid Rd Enhance capacity by installing a new pipe parallel to existing 30" pipe. <br /> 245 60 0 0 0 0 305 PIanlPolicy Documerrt: <br /> tTotal 2658 2689 1385 1650 800 800 9982 <br /> Total Project Cost: $60,000 <br /> Floral FIiIVRiverview Stormwtr Imprvmrrts Construct a high flow by-pass to reroute high flows from the open waterway between <br /> Floral Hill and Riverview Street. Design in FY 2000, construction in FY 2001. <br /> PlanlPolicy DceumeM: <br /> • Total Project Cost: $250,000 <br /> Hilyard Street, Tugman Park to 36th Provide additional capacity to drain Tugman Park canal by installing a new 48" pipe <br /> parallel to the existing 36"pipe and replacing the existing 30"pipe with a 54" pipe. <br /> PlanlPolicy Document: <br /> Total Project Cost: $160,000. <br /> tThese totals are not fund-specific and include all programmed funds. for information about specific funds and detailed project funding for <br /> <br /> FY2000 and FY2001, refer to the Two Year Fund Detail on the previous pagelsl. <br /> City of Eugene • 2000.2005 Capital Improvement Program City of Eugene • 2000.2005 Capital Improvement Program <br /> Project and Program Areas -Stormwater Project and Program Areas -Stormwater <br /> 33 34 <br /> <br />