r_~ <br />~~ <br />Ga <br />Implementation Sthedule (Continued) <br /> Phase i Phase x Phase 3 Policy <br /> Current Near Future Issue <br />* Future Projects # <br />Item Description $So,ooo $750,000 <br />9 Provide sanitary sewer X 4 <br />10 Provide electrical service X 4 <br />11 Add permanent storage X 4 <br />12 Add public restrooms X 4 <br />13 Assess & repair condition of plumbing X 4 <br />14 Removable pedestrian barrier along Oak St. X 6 <br />D Stage Areas <br />1 East stage location works well 2 <br />2 Upgrade electrical service for sound & lighting X 4 <br />3 Shnplify steps, keep raised platform X 6 <br />4 Alternate stage on west park block at SW area X 2 <br />5 New stage with roof, acoustics, visibility, access X 12 <br />6 Upgrade existing stage to support performances X ' 2 <br /> <br />E ~ ~ ~ Generale ~' <br />1 Create special character unique to Park Blocks 7 <br />2 Balance urban and natural elements 7 <br />3 Add public art integrated with public spaces X X 3 <br />4 Respect history and original design, don't compromise <br />function 7 <br />5 Master plan Park Blocks, Coord design with 8th X X 11 <br />6 Make the 8th & Oak intersection more pedestrian oriented X 7 <br />7 Enhance connections with the Park Blocks and: 8 <br />8 Improve signage X 8 <br />9 Broadway & Willamette Streets X 8 <br />10 To the Overpark and Parcade garages X 8 <br />11 Implement a unified master plan 11 <br />12 Uniform theme of pavements, and other design elements X X 7 <br />13 Alternative pavements on surounding Park Streets X 7 <br />Eugene park 8inckzNmprov4ments•ro/z8/n4 <br />Page ~x <br />4] <br />l] <br />f7 <br />1~ <br />p <br />I=] <br />I; <br />r_. <br />~~ <br />Implementation Schedule (continued) <br /> Phase i Phase x Phase 3 Polity <br />~ Current Near <br />Future Future <br />Projects Issue <br /># <br />Item Description $So,ooo $750,000 <br />14 Strong pedestrian connections across streets X X 8 <br />15 Streets without curbs for accessibility & flexibility X 7 <br />16 Provide sriuctures for shelter and performance X X 12 <br />17 Identify & enhance unique characteristics: 7 <br />18 Plantings, trees, shrubs, ground cover, lawn X X 7 <br />19 Tall cedar trees X X 7 <br />20 Paving materials, 8 x 8 pattern X X 7 <br />21 Benches, street lights, signs X X 7 <br />22 Balance permanent and temporary elements X X 7 <br />23 Encourage retail and restaurants to face the park g <br />24 Consider the relationship with the Hult 2 <br />25 Create places for a variety of large and small groups 15 <br />26 Replace the Butterfly Parking lot, build NW Park 1/4 <br />Block X 13 <br />27 Think big! 7 & 13 <br />* Numbers do not indicate prioritization <br />Note 1: Items not assigned to a particular phase are policies applicable to multiple phases. <br />Note 2: For Policy Issues see page 6. <br />Eugene Park Blocks Improvements - to/z8/o4 <br />Page ~3 <br />