New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2003-07 EWEB CIP Draft
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2003-07 EWEB CIP Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 12:30:48 PM
Creation date
6/1/2009 12:30:45 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
EWEB CIP
Document_Date
9/30/2002
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Hawkins Hill 607 Structural and Roof Repairs <br />Hawkins Reservoir needs roof repairs conducted and perhaps some seismic upgrades, the scope of which still <br />needs to be defined through a study to be conducted in 2002. EWEB is currently anticipating the same level of <br />capital required to repair the Hawkins Reservoir as the College Hill Reservoir repairs. <br />Engineering $ 25,000 SDC Funded $ 0 <br />Repair and Seismic Upgrades $210,000 Rate Funded Capital $250,000 <br />Administration 15 000 <br />Total Cost $250,000 <br />College Hill and Hawkins Hill Inlet/Outlet Improvements <br />EWEB will be studying and looking at ways to improve water quality through various operating regimes in the <br />large base level reservoirs. One way to do this is to improve the inlets and outlets at Hawkins and College Hill <br />Reservoirs. A study still needs to be conducted for this project. This project is planned for the later part of this <br />decade. <br />Cost ner Reservoir <br />Engineering $ 25,000 SDC Funded $ 0 <br />Inlet/Outlet Modifications $210,000 Rate Funded Capital $250,000 <br />Administration 15 000 <br />Total Cost $250,000 <br />Santa Clara Security Improvements <br />Replace security system that was removed during the 2002 recovering project. <br />Engineering $ 7,500 SDC Funded $ 0 <br />Contract $50,000 Rate Funded Capital $61,525 <br />Administration <br />Total <br />4 025 <br />$61,525 <br />i <br />Water Divisign -Five-Year Capital lm, provement Plan <br />.21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.