New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2003-07 EWEB CIP Draft
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2003-07 EWEB CIP Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 12:30:48 PM
Creation date
6/1/2009 12:30:45 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
EWEB CIP
Document_Date
9/30/2002
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Hayden Bridge Optimization/Basin Baffling <br />The Hayden Bridge expansion study also investigated the configuration of filters, chemical feed systems, and basin <br />geometry. We believe EWEB can increase production by approximately 12 mgd by optimizing existing systems. <br />Pilot testing will be necessary to ensure proposed optimization measures will not reduce water quality. The <br />following is a cost estimate for optimization of Hayden Bridge. <br />EWEB Labor $ 21,000 SDC Funded $991,000 <br />Engineering $ 60,000 <br />Construction Contract $850,000 <br />Administration (-7%) 60 000 <br />Total $991,000 <br />Sludge Removal Bed <br />Add an additional drying bed near the sedimentation basins for sludge handling. <br />Engineering $ 30,000 SDC Funded $0 <br />Construction Contract $230,000 Rate Funded Capital $280,000 <br />Administration 20 000 <br />Total $280,000 <br />Water Division -Five-Year Capital Improvement Plan <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.