EWEB will replace the existingpump gallery at Hayden Bridge with a new pump gallery adjacent to the 15 mg
<br />reservoir. The existing pump station will become a back up to the new station. The existing pump gallery is
<br />inefficient, in some cases the lazger pumps operate at 30 percent efficiencies. The new pump station will have a
<br />pumping range of 15 to 100 mgd, and will include vaziable speed drives. Along with the new pumps, it is
<br />necessazy to upgrade the electrical service for reliability and future expansion capability.
<br />EWEB $ 785,999 SDC Funded $10,542,250
<br />Consultants $ 1,820,256 Rate Funded Capital $ 3,514,083
<br />Pre-Purchases $ 1,644,494
<br />General Contract $ 9,565,584 Pre 2001 Costs $ 562,573
<br />Contingency $ 240,000 2001 Costs $5,764,950
<br />Total Estimate $14,056,333 2002 Costs $6,687,405
<br />Project Budget $14,500,000 2003 Budget $1,041,333
<br />Hayden Bridge Treatment Plant Expansion
<br />EWEB conducted a re-evaluation of our demand forecast and the production capacity of the Hayden Bridge
<br />Treatment Plant in combination with the new 15 MG reservoir. As a result, we have decided that this project
<br />can be deferred. The development and utilization of the groundwater project for emergencies adds great
<br />confidence that this is a prudent decision. The costs for this project will remain in the plan for documentation
<br />sake, but will not be reflected in the 5-yeaz plan. The treatment plant expansion entails the design and
<br />construction of an additional sedimentation basin and two filters to add an additional 14 mgd of capacity. A
<br />new configuration of raw water lines into the plant will also be required. Currently, the timing for this project is
<br />2002/2003. Black & Veatch will be in pre-design and looking closer at the Hayden Bridge treatment processes
<br />in 2000. The following is the current understanding of future costs for this project.
<br />Raw Water Inlet Pioine
<br />Design
<br />Site Work
<br />Materials
<br />Controls & Equip.
<br />Labor
<br />Const. Mgmt
<br />Inspection
<br />EWEB Admin. (7%)
<br />Subtotal
<br />Contact/Sed. Basin
<br />$ 47,000
<br />$ 6,900
<br />$291,800
<br />$ 50,000
<br />$112,300
<br />$ 14,000
<br />$ 24,000
<br />39000
<br />$585,000
<br />Two New Filters
<br />$ 53,000 $ 291,000
<br />$ 33,200 $ 22,200
<br />$363,200 $ 863,600
<br />$ 0 $ 949,400
<br />$127,600 $ 587,800
<br />$ 16,000 $ 73,000
<br />$160,000 $ 208,000
<br />53 000 210000
<br />$806,000. $3,205,000
<br />1