New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2006-11 Eugene CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2006-11 Eugene CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:05:31 AM
Creation date
6/1/2009 12:30:01 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2011
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Space Plan have been initiated. In May 2002, voters approved an $8.68 million bond issue <br /> <br /> ~~I ~ ~ <br /> for construction of a new Downtown Fire Station and a Live Fire Training Building. Council <br /> also approved the use of up to $3.9 million from the Facility Replacement Fund to construct the <br /> Police facility on Garfield Street adjacent to the Public Works Department's Roosevelt Yard. <br /> This new building houses the Police forensics lab and property section, which were moved from <br /> the basement of City Hall. The remaining elements of the Downtown City Space Plan are <br /> addressed by the City Hall Replacement project. Additional detail on the City Hall Replacement <br /> ~ ' project is in the unfunded project description section. <br /> i <br /> Building Preservation and Deferred Maintenance <br /> In 1995, the City Council adopted a Facility Condition Report (FCR) process, which establishes <br /> i baseline data about the condition of facilities supported by the General Fund through a detailed, <br /> structured inspection process. All capital building and facility projects in the General Fund are <br /> \ ~ assessed and prioritized on the basis of this report <br /> The 2001 FCR found that, for the first time since the initial Facility Condition Report in 1995, <br /> ~ the Distribution of Existing Deficiencies had been reduced, reversing the trend of prior years. <br /> Between the 1997 and 2001 audits of General Fund facilities, the backlog of deficiencies <br /> decreased by over 40%. While the condition of the current inventory of General Fund buildings <br /> has improved due to the replacement of older facilities with new construction, the major reasons <br /> for the improvement in the condition of General Fund facilities prior to 2001 are the increased <br /> , level of reinvestment in facility preservation and improved preventative maintenance practices. <br /> This reflects in large part the increased capital funding committed to facility preservation. <br /> Distribution Of Existing Deficiencies <br /> 10.0% - -~..r___...._._ <br /> ~ 8.0% - <br /> 1995 <br /> F <br /> t 4 <br /> U N O <br /> ~ + ~ ~ ° y <br /> h. <br /> y 1997 <br /> ~k: <br /> > 4.0% ~ ~ ? 2001 <br /> ° <br /> <<_ H/S/W Structure Interiors Srvc. Sys. <br /> CIP Category <br /> While progress on addressing the backlog of deficiencies has been made, deficiencies will <br /> ~ continue to emerge during the next five years due in large part to the average 30 year age of <br /> General Fund facilities. Building mechanical systems make up the largest component of <br /> ' emerging deficiencies, and will require continuing rehabilitation to prevent system failures. <br /> In addition, the City has added nearly 200,000 square feet of space to the General Fund building <br /> inventory since the 2001 FCR was completed, increasing the total area of buildings to be <br /> City of Eugene 2006 - 2011 Capital Improvement Program <br /> ~ ~ 69 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.