Transportation Funded Projects <br /> in thousands of dollars <br /> ~ ~ <br /> j <br /> _ <br /> i <br /> Game Farm Road From City Upgrade to a two-lane urban facility. Typical section would <br /> Limits to I-5 match proposed County improvements to the west. Two ~ <br /> 12-foot lanes with a center 12-foot access lane and 5-foot <br /> Plan/Policy Document• bike lanes. A 5-foot setback sidewalk would be constructed <br /> • on the south side with road drainage captured in a roadside <br /> Trans/Plan ditch on the north side of the street. <br /> Costs: ` ~ _ j <br /> <br /> j 2006 Total <br /> Capital $638 $638 <br /> Total $638 $638 <br /> ~ , <br /> i <br /> i <br /> i <br /> ]eppesen Acres Road Upgrade to a 2-lane urban facility from Gilham Road to <br /> Providence Street. Improvements include street lights, <br /> street trees, two 12-foot travel lanes, and planting strips and - <br /> ~ Plan/Policy Document• 5-foot sidewalk on both sides of the street. Total <br /> • right-of-way required is 50-feet. <br /> Trans/Plan <br /> COStS: ~ <br /> 2009 Total <br /> Capital $866 $866 <br /> Total $866 $866 <br /> Maple St.- Elmira Rd. to Upgrade to neighborhood collector with shared bicycle and ( <br /> Roosevelt Blvd. transit facilities. Improvements include street lights, street <br /> trees, two 14-foot travel lanes, and 7-foot 5-inch planting <br /> Plan/Policy Document• strips and 5-foot sidewalk on both sides of the street. Total <br /> • right-of-way required is 55-feet. <br /> Trans/Plan, Bethel-Danebo Refinement Plan , <br /> ` , <br /> ( <br /> Costs: <br /> 2011 Total << <br /> Capital $321 $321 <br /> Total $321 $321 <br /> I ~ <br /> City of Eugene 2006-2011 Capital Improvement Program ! <br /> 138 <br /> <br />