New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2006-11 Eugene CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2006-11 Eugene CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:05:31 AM
Creation date
6/1/2009 12:30:01 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2011
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> Transportation Funded Projects <br /> a <br /> in thousands of dollars <br /> r e: <br /> . <br /> Bertelsen Road (18th -Bailey Upgrade to minor arterial standards with two 12-foot travel <br /> >.l H~II) lanes, a 12-foot center turn lane, 5-foot bike lanes and <br /> 5-foot sidewalks. <br /> ~ ` Plan/Policy Document: <br /> ` _ ~ Trans/Plan <br /> l ~ <br /> 1 <br /> COStS: <br /> ~ 2008 Total <br /> ~ i'~`~ Capital $2,057 $2,057 <br /> Total $2,057 $2,057 <br /> i <br /> Central Area Transportation Traffic modifications to existing streets and signals in <br /> Study Implementation downtown Eugene to improve traffic operations and safety. <br /> f <br /> Plan/Policy Document: <br /> " Central Area Transportation Study <br /> 1, <br /> << Costs: <br /> '1 2006 2007 2009 Total <br /> Capital $70 $70 $150 $290 <br /> Total $70 $70 $150 $290 <br /> _i <br /> Elmira Road (Hwy. 99 - From Bertelsen to Maple: <br /> Bertelsen) Upgrade to neighborhood collector with shared bicycle and <br /> ' transit facilities. Improvements include street lights, street <br /> ~ ' Plan/Policy Document: trees, two 14-foot travel lanes, and 7-foot 5-inch planting <br /> ~ strips and 5-foot sidewalk on both sides of the street. Total <br /> Trans/Plan, Bethel-Danebo Refinement Plan right-of-way required is 55-feet. <br /> ~ From Maple to HWY 99: <br /> Upgrade to 28-foot residential street. Improvements include <br /> \ j Costs: street lights, street trees, and planting strips and sidewalk on <br /> 2007 Total both sides of the street. Total right-of-way required is <br /> I~~ Capital $3,089 $3,089 55-feet. <br /> Total $3,089 $3,089 <br /> ~ 1 <br /> <br /> i~ <br /> ~ City of Eugene 2006-2011 Capital Improvement Program <br /> ~ _ 137 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.