New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2002-07 Eugene CIP (2)
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2002-07 Eugene CIP (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:02:40 AM
Creation date
6/1/2009 12:29:53 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2007
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Transportation <br />Traffic Operations Improvement Program Safety and transportation system management improvements, including adding turn <br />lanes and bicycle lanes, median islands, safety devices, and other restriping and <br />channelization modifications. <br />Plan/Policy Document: Trans Plan Policy, Bicycle Master Plan <br />Total Project Cost: $250,000 <br />Traffic Signal Improvements and Upgrades Install new traffic signals and upgrade the traffic signal system to improve <br />responsiveness, reduce delay, improve air quality, and facilitate multi-modal traffic <br />flow. Locations for installing new traffic signals are based on a priority rating system <br />that considers traffic volumes, delays, accidents, standard signal warrants and other <br />traffic and development-dependent factors. <br />Plan/Policy Document: Traffic Signal Priority List, Trans Plan <br />Total Project Cost: $843,000 <br />New Caaital Facilities <br />Legacy Extension, Avalon to Royal Ave. Extension of Legacy Street, from Avalon Street to Royal Avenue. <br />Plan/Policy Document: TransPlan Royal Avenue Specific Plan <br />Total Project Cost: $2,397,000 <br />Roosevelt Extension, Terry to Royal Extension of Roosevelt Boulevard, from Terry Street to Royal. <br />Plan/Policy Document: Trans/Plan; Royal Avenue Specific Plan <br />Total Project Cost:. $2,927,000 <br />Services for New .Development.. Unspecified petitioned infrastructure improvements to support new development and <br />respond to infrastructure needs in developing areas (typically transportation <br />improvement projects that may include wastewater and stormwater system <br />components). <br />Plan/Policy Document: SDC City Code & Methodologies <br />Total Project Cost: $4,296,000 <br />City of Eugene 2002-2007 Capital Improvement Program <br />64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.