New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2002-06 Lane County CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2002-06 Lane County CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 12:08:56 PM
Creation date
6/1/2009 12:29:34 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
Lane County CIP
Document_Date
6/30/2006
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM <br /> I <br /> i <br /> i <br /> Marcola Road, MP 10.43-11.70 r«,<~t~ 1900-00 <br /> Parsons Creek Road to wendling tvtE': 6.22 tC2 11.70 <br /> I°;c~ie:.t 89005 €~C;: Rural Major Collector (FAS) <br /> ~ C;,ta~yo€?~: GENERAL CONSTRUCTION <br /> <br /> 'I ~e~f€s.;~: Widen and overlay. ' <br /> .~€stifi~~.~Ii;;r{: High speeds and heavy truck traffic necessitate a need to widen the existing 24 foot pavement and add <br /> shoulders to meet current standards. The roadway was overlaid with 2 inches of asphalt in 1988, with an <br /> additional 2 inches planned for this project when shoulders are added. Project will complete needed <br /> pavement structure. ~ <br /> F~` 2002 <br /> ;i~~t: 1,200,000 <br /> R~ :=ti: 120,000 <br /> T;:~7 ~.i..: 1, 320,000 <br /> I <br /> Marcola Road, MP 11.49-16.08 f~c~r~c:1 lsoo-oo ~ <br /> Wendling Road to Johnson Road P•!Ir : 11.49 is 16.08 <br /> f>rr3~.ct W: 90015 f t;:: Rural Major Collector (FAS) <br /> 11 i:~3tE;•,a3r~': GENERAL CONSTRUCTION i~ <br /> ~ 5s:.cs}~e: Widen and overlay. <br /> is€~fiCCSti:rr~: High speeds and heavy truck traffic necessitate a need to widen the existing 24 foot pavement and add <br /> ~ shoulders to meet current standards. The roadway was overlaid with 2 inches of asphalt in 1988, with an <br /> additional 2 inches planned for this project when shoulders are added. Project will complete needed ` J <br /> pavement structure. This project also includes work to Cash Creek Bridge. The timber piling and caps are <br /> decayed and require replacement. Helper bents have been installed by County Forces to assist the , <br /> i decayed members. <br /> I! I" Y 2004 <br /> ~..cst: 2,700,000 <br /> l~~ct~^J: 270,000 <br /> _l z,~"1~A~: 2,970,000 ~ ~ i <br /> i:.k(`,:: ~ li`~%: i.~l~>?r.,S;;=:. ~i~ {;;{3"il€€k?€'i i <br /> ~i~tEi3Cj <br /> TF:S ~r<~ie ~ St~Jtxrslrl.rc:[r.€€t St€~structur~a G`;=ic1Y~ a~~r:gt~ ~'ez~~ Er.tiit Sig AP 1 Gitti ' _ > <br /> 16S 1 W 05B 14636A PCN WCNCP 30 46 1964 86 8 / 6 <br /> i <br /> i <br /> 1 - <br /> McVay Highway Realignment ~ <br /> Bloomberg Road to 30th Avenue <br /> ~ j <br /> I'rt)st~t;i.:,;: 97008 ~ " <br /> 1 <br /> . <br /> %~ra<>,^nr~: GENERAL CONSTRUCTION <br /> Ss: o~e~: Construct connector road between Bloomberg Road and 30th Avenue. <br /> is <br /> .astifi;~ati~sra; Traffic conditions on McVay Highway during Lane Community College peak hour commuter arrivals make <br /> turning movements from Bloomberg Road difficult. <br /> €~Y 2003 ~ ` <br /> ::;€~~t: 500,000 <br /> R1ir~': 50,000 <br /> ~ `.:~T~..: 550,000 <br /> I <br /> 33 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.