New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2002-07 Eugene CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2002-07 Eugene CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 12:10:03 PM
Creation date
6/1/2009 12:29:23 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2007
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Building and Park FaciC'rties <br /> Library Parking Repair Crack repair and painting of parking level walls and ceilings. <br /> m n • Parkin Structure Condition Anal. sis PSCA <br /> Plan/Pohcy Docu a t. g y ( ) <br /> Total Project Cost: $10,000 ~ <br /> Overpark Waterproofing Replace waterproofing membrane at all levels; repair cracks in walls; pressure wash <br /> and seal walls and facades. j <br /> Plan/Policy Document: Parking Structure Condition Analysis (PSCA) <br /> Total Project Cost: $404,000 <br /> Z <br /> Parcade Preservation and Maintenance Clean and seal walls; pressure wash entire structure. <br /> Plan/Policy Document: Parking Structure Condition Analysis (PSCA) <br /> I <br /> Total Project Cost: $30,000 .'~i <br /> j <br /> I <br /> ~l <br /> j <br /> I _ <br /> j Parcade Waterproofing Replace top level membrane. <br /> i <br /> Plan/Policy Document: Parking Structure Condition Analysis (PSCA) <br /> i <br /> Total Project Cost: $621,000 <br /> Parking Facilities Improvements Upgrade and rehabilitate city-owned downtown parking structures. Funded by <br /> Parking Enterprise Funds. <br /> Plan/Policy Document: Parking Structure Architectural Study <br /> Total Project Cost: $160,000 <br /> I <br /> Pearl St. Carage Preservation and Maintenance Paint exterior of building. <br /> Plan/Policy Document: Parking Structure Condition Analysis (PSCA) <br /> Total Project Cost: $40,000 <br /> ~ , <br /> Pearl St. Carage Waterproofing Install waterproofing membrane on fourth level. <br /> Plan/Policy Document: Parking Structure Condition Analysis (PSCA) <br /> Total Project Cost: $150,000 <br /> Primary Building Systems Preserve and maintain the exterior systems of City buildings, such as foundations, <br /> sub/superstructures, floors, exterior closure and roof. ! , , <br /> Plan/Policy Document: Facility Condition Report, Uniform Building Code ; <br /> Total Project Cos#: $8,129,000 <br /> t„_ <br /> City of Eugene 2002-2007 Capital Improvement Program <br /> r" <br /> 33 <br /> <br /> ~ <br /> _ _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.