. ~ Building and Park Facilities <br /> tThese totals are not fund-specific and include all programmed funds. For information about specific funds and detailed project funding for <br /> FY2002 and FY2003 , refer to the Two Year Fund Detail on the previous page(s). <br /> D <br /> escription of Funded Projects <br /> Preservation/Maintenance <br /> Broadwa Place Gar a Preservation Re au cracks in deck; paint interior. <br /> ~ Y ~ P~ <br /> Plan/Policy Document: Parking Structure Condition Analysis (PSCA) <br /> Total Project Cost: $65,000 <br /> <br /> I <br /> : <br /> Buildi~ Service Systems Preserve and maintain building service systems, including elevators, mechanical <br /> systems {plumbing, heating, cooling)needed to maintain reasonable service levels. <br /> .Program includes electrical systems necessary for lighting, equipment and computers. <br /> Plan/Policy Document: Facility Condition Report, Uniform Building Code <br /> Total Project Cost: $2,674,000 <br /> EPAC Garage Repair .Repair cracks and repaint. <br /> Plan/Poiicy Document: Parking Structure Condition Analysis (PSCA) <br /> Total Project Cost: $15,000 <br /> EPAC Garage Stair Repair Repair and seal stairs. <br /> Plan/Policy Document: Parking Structure Condition Analysis {PSCA) <br /> Total Project Cost: $8,000 <br /> EPAC Garage Waterproofing Replace waterproofing membrane at first and fifth levels; clean and seal all decks and <br /> walls. <br /> PIan/Policy Document: Parking Structure Condition Analysis (PSCA) <br /> - Total Project Cost: $492,000 <br /> Health, Safety & Welfare Preserve and maintain the health, safety and welfare of users of City facilities, <br /> including asbestos abatement, air quality and building safety programs designed to <br /> protect the public and employees. <br /> PIan/Policy Document: Facility Condition Report, Uniform Building Code <br /> Total Project Cost: $1,367,000 <br /> 1,.• <br /> City of Eugene 2002-2007 Capital Improvement Program <br /> 32 <br /> • <br /> _ <br /> <br />