Stormwater <br /> i <br /> Description of Funded Projects <br /> Upgrades and Capacity Enhancement <br /> Beaver St &Hunsaker Ln Stormwater system improvements related to County road improvements to <br /> Stormwater Improvements Beaver St. and Hunsaker Ln. between Division and River Rd. <br /> Plan/Policy Document: CSWMP, Stormwater Basin Plans; Lane County CIP ` <br /> i <br /> Total Project Cost: $50,000 <br /> Game Farm Rd Stormwater Stormwater system improvements related to County road improvements to <br /> Improvements Game Farm Rd between Coburg Rd and the Eugene City Limits. <br /> Plan/Policy Document: CSWMP, Stormwater Basin Plans; Lane County CIP <br /> Total Project Cost: $50,000 ~ <br /> Greenhill Rd. Stormwater Stormwater system improvements related to County road improvements to - <br /> ~ Improvements Greenhill Rd. between the Southern Pacific Railroad right of-way and Barger <br /> ~ Ave. <br /> Plan/Policy Document: CSWMP, Stormwater Basin Plans; Lane County CIP <br /> Total Project Cost: $100,000 <br /> Greenhill Tributary Storm Funds previously budgeted for Phase I design to address flooding problem in ; <br /> Improvements -Phase II Greenhill tributary. Phase I construction in Summer 2003. Phase II design for <br /> water quality and natural resources enhancements in FY07. Phase II <br /> construction in FY08 and FY09. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $374,000 <br /> Roosevelt Channel -Culvert Replace the existing pipe with a bridge (20' wide x 55' long) and reconstruct the <br /> Replacement channel to match the size and shape of the downstream open waterway. <br /> Plan/Policy Document: Stormwater Basin Plans <br /> Total Project Cost: $192,000 <br /> <br /> i <br /> Royal Ave., Terry to Greenhill Stormwater system improvements related to County road improvements to <br /> Rd. Royal Ave. between Terry St. and Greenhill Rd. <br /> Plan/Policy Document: CSWMP, Stormwater Basin Plans; Lane County CIP <br /> Total Project Cost: $100,000 <br /> ; <br /> City of Eugene 2004-2009 Capital Improvement Program <br /> 80 <br /> _ _ _ _ <br /> <br />