New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 1998-2003 Eugene CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 1998-2003 Eugene CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 7:59:51 AM
Creation date
6/1/2009 12:28:59 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2003
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Building and Park Facilities -Unfunded Program (Cont.) <br />- New Car~ital Facilities <br />9-1-1 Communications Center Construct a new 9-1-1 Communications Center to replace the existing facility, which is <br />currently located in a high earthquake-risk building (could be done in conjunction with <br />the Public Safety Building project). <br />Plan/Policy Document: Public Safety Long Range Plan <br />I i <br />I <br />Total Project Cost: $3,000,000 <br />I~ <br />Alton Baker Maintenance Facility Relocate Alton Baker Park maintenance facility from the meadows and woodlands (1A <br />& 1 B) area to the cultural center (2A) area. <br />PIan/Policy Document: Alton Baker Master Plan <br />Totat Project Cost: $500,000 <br />DPS Communication Tower Lease land, complete necessary site improvements, and construct communication <br />tower for public safety communications. <br />Plan/Policy Document: Public Safety Long Range Plan <br />Total Project Cost: $400,000 <br />Emergency Vehicle Obstacle Course Construct an emergency vehicle obstacle course (in cooperation with other County <br />°` ` ' public safety agencies) for police, fire, paramedic and other City staff to develop safe <br />driving skills under a variety of road conditions, and for regional driver training of <br />personnel from other public agencies. <br />Plan/Policy Document: Public Safety Long Range Plan, David N. Burks Regional <br />Public Safety Training Facility Master Plan <br />Total Project Cost: $1,353,000 <br />Fire Station #1 Relocation Relocate Fire Station #1 to a more secure building less subject to earthquake damage. <br />Plan/Policy Document: Public Safety Long Range Plan <br />Total Project Cost: $4,000,000 <br />_ Fire Station #5 Apparatus Bay Purchase land next to Fire Station #5 and construct an apparatus bay to house 4-wheel <br />' drive vehicles closer to potential deployment sites in the hilly and wooded areas of <br />-' South Eugene. <br />Plan/Policy Document: Public Safety Long Range Plan <br />(.."'; <br />Total Project Cost: $250,000 <br />Future Fire Station Land Acquisition Purchase land in the area of 11th Avenue and Terry for future use as a fire station, <br />I extending coverage to the west and south of Fire Stations #8 and #10 by the Year 2010. <br />I <br />i <br />'' Plan/Policy Document: LCOG's 1990 Fire Station Location Study <br />~ '; Total Project Cost: $400,000 <br />Maintenance Equipment Storage Building Construct 11,000 square foot open structure to protect stored maintenance vehicles <br />and equipment from inclement weather. <br />I___. <br />! Plan/Policy Document: PWM Roosevelt Facility Master Plan <br />', <br />l_ <br />Total Project Cost: $400,000 <br />'; City of Eugene •.1998-2003 Capital Improvement Program <br />Project and Program Areas -Building and Park Facilities <br />~, 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.