New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 1998-2003 Eugene CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 1998-2003 Eugene CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 7:59:51 AM
Creation date
6/1/2009 12:28:59 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2003
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NEIGHBORHOOD NEEDS REQUESTS <br />1992-1996 <br />Neighborhood Year Capital Projects In IP <br />Organization u t d Re u to Funded Comments <br />Whiteaker Community 1995 Install street lights in various neighborhood * Neighborhood should specify <br />Council continued locations. locations so they can be added to <br /> list. List is prioritized. Highest <br /> priority lights to be installed during <br /> Fall-Winter 1996-1997, using <br /> council-approved funding. <br /> Additional lights to be evaluated as <br /> part of Residential Street Light <br /> program. <br /> 1995 Speed humps requested at non-specific Neighborhood should discuss <br /> locations. specific locations with City for <br /> inclusion on Neighborhood <br /> Transportation Program request list. <br /> 1992-3-5 Assess pedestrian safety at intersection of No Referred to PW Transportation <br /> Van Buren and Blair. Suggest stop operations for review. <br /> light/sign and pedestrian crosswalks. <br /> 1992 Install pedestrian-scale "historic" lighting No <br /> and design street signage, interpretive <br /> plaques and markers. <br /> 1992 Modify, upgrade and expand Whiteaker No <br /> Public Safety Station. <br /> 1992 Construct recycling center adjacent to No <br /> Whiteaker Public Safety Station. <br />*These projects will be evaluated for funding in this CIP within existing program categories rather than as separate, stand-alone projects. <br />**These projects have been completed or are in progress as prior-year CIP projects, other agencies' projects, or operational improvements. <br />City of Eugene .1998-2003 Capital Improvement Program <br />Appendix I <br />80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.