New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2000-01 MWMC Budget
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2000-01 MWMC Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 12:08:17 PM
Creation date
6/1/2009 12:28:47 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Budget
Document_Date
6/30/2001
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Metropolitan Wastewater Management Commission Budget and Program Summary <br /> Personnel Services <br /> Personnel Services shows a net budget decrease of $48,020 or 1%. The major changes are in the <br /> following budget categories: <br /> Staffing <br /> Reallocation of 3.43 FTE to LocaUStormwater Funds -Budget Reduction ($195,280) <br /> • The FY 00-01 budget proposal includes a decrease of 3.43 FTE in the regional fund. During <br /> preparation of the annual budget proposal, the distribution of FTE hours for regional and non- <br /> regional activities from the previous year is reviewed. This year, data from our Computerized <br /> ' Maintenance Management System was used to better determine the actual work time that <br /> , should be allocated to the different funding sources. , <br /> i <br /> I, <br /> • Reallocation of administrative support staff time to all the different funding sources. The <br /> . ; following adjustments reflect these changes; 1.30 was transferred to the Eugene Local fund; <br /> 1.25 to the Springfield local fund; .16 to the Seasonal Industrial Waste site; and .72 to the <br /> Stormwater fund. <br /> Health Insurance -Budget Request $358,107 [Increase $16,765 or 5%] <br /> • Health insurance costs increased 6.5% from the FY 99-00 budget. <br /> Materials and Services <br /> The proposed Materials and Services account represents a total FY 00-01 increase of $273,296, <br /> which is a 1D% increase. The major changes are in the following budget categories: <br /> Utilities -Budget Request $414,701 [Increase of $70,385 or 20%] <br /> <br /> I' ' ' • The major item in this line account is for new electrical costs associated with the operation of <br /> ~i ' ' the biosolids dewatering facility (estimated at $25,000). <br /> • An increase in overall electrical rates of 6% is anticipated in Apri12000, increasing this line <br /> account by $17,678. <br /> • This line account was increased by an additional $27,707 based on actual costs and usage from <br /> FY98-99 which are projected to continue in FY00-O1. <br /> i. <br /> Maintenance of Equipment & Facilities -Budget Request $388,044 [Increase of $128,295 or <br /> 49%] <br /> i <br /> • This line account is impacted by a one-time expenditure of $150,000 to clean out the solids in <br /> , the treatment plant lagoon. <br /> Page 14 ' FY 00-01 BUDGET <br /> ~ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.