New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2000-01 MWMC Budget
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2000-01 MWMC Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 12:08:17 PM
Creation date
6/1/2009 12:28:47 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Budget
Document_Date
6/30/2001
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Metropolitan Wastewater Management Commission Budget and Program Summary <br /> ~ PROGRAM: REGIONAL WASTEWATER FACILITIES <br /> OPERATION AND MAINTENANCE -CITY OF EUGENE <br /> In FY 00-O1, Eugene staff will support the following major regional initiatives in addition to <br /> ongoing operational activities. <br /> • Continue efforts to optimize service effectiveness and efficiency. <br /> • Implement and sustain an environmental management system, and become registered as <br /> compliant with the ISO 14001 standard for environmental management. <br /> • Complete construction and start-up of the new biosolids dewatering facility, and process at <br /> least 25% of the annual biosolids production through the facility. <br /> i. <br /> • Continue to provide leadership in the assessment of impacts and the development of <br /> mitigation measures related to the Endangered Species Act listings for the Willamette River. <br /> ' • Complete construction of the upgrade for the environmental analytical laboratory. <br /> • Develop O&M plans to implement the recommendations of the Wet Weather Flow <br /> Management study. <br /> • Continue to manage the O&M responsibilities of the NPDES permits for the wastewater and <br /> ~ plant stormwater programs, and work with Springfield staff on permit renewal activities once <br /> the renewal process is initiated by the State. <br /> • Complete equipment replacement and major rehabilitation projects, including replacement of <br /> the W2 water strainers, the heat exchangers for the # 1 engine generator, and clean out of the <br /> accumulated solids in the lagoons serving the Seasonal Industrial Waste Site and. the main <br /> wastewater treatment plant. <br /> I <br /> Significant Changes For FY 00-01 1 <br /> The proposed budget for Operations and Maintenance personnel, materials and services, and capital <br /> for FY 00-01 totals $6,959,930. The budget categories show a total 4% increase from the FY 99-00 l., <br /> budget. <br /> Significant changes in the service levels proposed for the FY 00-O1 operations and maintenance . <br /> budget of the regional wastewater treatment facilities include: <br /> • A net decrease of 3.43 regional FTE in the Wastewater Division and a .16 increase for SIW <br /> staffing. <br /> • A cost of living increase of 3%. <br /> • A one-time expense for cleaning the solids out of the treatment plant lagoon. <br /> Additional information about these changes is provided in the following section on significant <br /> variations in expenditure levels. <br /> <br /> i <br /> Page 13 FY 00-0 i BUDGET <br /> <br /> E <br /> _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.