New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2001-02 Regional Wastewater Program Budget
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2001-02 Regional Wastewater Program Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:05:40 AM
Creation date
6/1/2009 12:28:40 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Budget
Document_Date
6/30/2002
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Metropolitan Wastewater Management Commission Capital Programs <br />REGIONAL WASTEWATER PROGRAM <br />CAPITAL PROGRAMS <br />CAPITAL IMPROVEMENTS PROJECTS <br />The FY 01-02 Capital Improvements Program (CIP) budget of $5,745,226 (included in <br />Springfield's administration budget) is composed of projects identified by the Facilities Master <br />Plan, the Biosolids Master Plan, and the Wet Weather Flow Management Plan (WWFMP). The <br />FY 01-02 CIP is funded using a combination of CIP reserves and-System Development Charges <br />(SDC's). CIP project summaries are provided below (see Capital Improvements memo to <br />MWMC, February 7, 2001 for detailed project descriptions). Other capital programs, including <br />the Equipment Replacement Program, the Major Rehabilitation Program, and Major Capital <br />Outlay are funded in Eugene's FY 01-02 operations and maintenance budget at $402,372,. <br />$456,000 and $421,000 respectively. The funding for FY 01-02 will come from each program's <br />respective reserves. Itemized lists of Equipment Replacement purchases, Major Infrastructure <br />Rehabilitation projects, and Major Capital Outlay are included on page 28. <br />1. Biosolids Management -Poplar Farm FY 01-02 Capital Budget = $2,172,459 <br />Following the Commission's adoption of the Biosolids Citizens Advisory Committee <br />recommendations, staff began studying the feasibility of developing a dedicated land application <br />site for the purpose of growing poplars with applied Biosolids. During this search, a 596-acre <br />parcel located adjacent to the existing Biosolids Management Facility became available for sale. <br />In November 1998, the MWMC approved the first in a series of purchase options and staff began <br />a process of analyzing the suitability of the site. This process was completed in May 2000, and <br />in June the Commission approved the purchase. The sale was completed in July. After expenses <br />and credits, the final purchase price was $2,832,120 including payments on the option. Project <br />expenditures through FY 00-O1, estimated to be about $3,115,000 include costs for the site <br />feasibility analysis and management plan, property purchase and design of site improvements. <br />The remaining balance, approximately $2,172,500, will be carried forward into FY 01-02 and <br />applied toward start-up capital costs. Total projects costs for land acquisition, capital <br />construction and site preparation are estimated to be about $5.2 million. <br />2. Non-Process Facilities Imp -Lab Remodel FY 01-02 Capital Budget = $977,200 <br />During the FY 97-98 budget discussion, the Commission approved Phase I of four phases of <br />building improvements identified in the Regional Facilities Master Plan. Phase I, budgeted at <br />$610,300, was intended to provide for design and construction to address the functional and <br />space needs of the analytical laboratory. Construction bids were rejected because they exceeded <br />the engineer's estimate by a substantial margin. Over the past two years, staff has extensively <br />evaluated the project cost drivers and potential cost savings alternatives for the lab remodeU <br />expansion. This evaluation has included: re-evaluation of the project objectives; re-estimation of <br />the project costs with some modifications to materials and components; and additional consultant <br />review of cost saving design alternatives. In February of 2001, the Commission authorized staff <br />to proceed with the lab remodel and expansion based upon the original design, modified to <br />include alternate components and materials. The $700,000 budgeted last year, together with <br />Page 26 FY 01-02 Budget <br />
The URL can be used to link to this page
Your browser does not support the video tag.