New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2001-02 Regional Wastewater Program Budget
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2001-02 Regional Wastewater Program Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:05:40 AM
Creation date
6/1/2009 12:28:40 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Budget
Document_Date
6/30/2002
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Metropolitan Wastewater Management Commission Budget and Program Summary <br />CAPITAL PROGRAMS <br />The RWP budget includes several capital programs, including the Capital Improvements <br />Program (CIP), the Major Infrastructure Rehabilitation Program, and the Equipment <br />Replacement Program. The CII' consists of capital projects that are administered by the City of <br />Springfield as part of its contract responsibilities for MWMC. CIP projects typically provide for <br />new or expanded facilities and/or capacity enhancements. The annual CIP budget is <br />administered by Springfield and is separate from the Operating Budget. <br />e proposed FY 01-02 CIP is funded by a combination of SDC's, contributions from the <br />operating budget, and capital reserves. The proposed FY 01-02 CIP budget is summarized in <br />Figure 3 below, and described on pages 25-29. <br />Other capital programs, consisting of Major Infrastructure Rehabilitation Program and the <br />Equipment Replacement Program include capital projects/purchases that are administered by the <br />City of Eugene as part of its contractual responsibilities for MWMC. These programs provide <br />for major construction, repairs, and purchases necessary to maintain functionality, lifespan, and <br />effectiveness of existing facility assets and capacity. The proposed FY 01-02 budget for these <br />capital programs is summarized in Figure 3 below, and itemized on the page 27. <br />FIGURE 3 <br />REGIONAL CAPITAL PROGRAMS <br />DESCRIPTION FY 01-02 PROPOSED BUDGET <br />Capital Improvement Projects (Springfield Administration) <br />Non-Process Facility Improvements -Lab Remodel 977,200 <br />Biosolids Management Facilities -Poplar Farm $2,172,459 <br />Wet Weather Flow Mgmt Plan -Implementation 595,567 <br />Wet Weather Flow Mgmt Plan -Peak Flow Improvements 2 000 000 <br />Total (Not Included in Operating Budget) $4,768,026 <br /> <br />Other Capital Programs (Eugene Operations) <br />Equipment Replacement $402,372 <br />Major Rehabilitation 456,000 <br />Major Capital Outlay 421,000 <br />Total (Not Included in Operating Budget) $1,279,372 <br />Page 18 FY 01-02 Budget <br />
The URL can be used to link to this page
Your browser does not support the video tag.