i <br />-' Metropolitan Wastewater Management Commission Budget and Program Summary <br />FIGURE 5 <br />REGIONAL WASTEWATER PROGRAM <br />BUDGET SUMMARY AND COMPARISON <br /> ADOPTED AMENDED PROPOSED <br /> BUDGET BUDGET BUDGET CHANGE <br /> FTE FY 01-02 FY 01-02 FTE FY 02-03 INC(DECR) <br />OPERATING BUDGET <br />Administration ** 7.30 $1,416,505 $1,466,339 8.40 $1,638,457 $221,952 <br />Operations *** 64.50 7,287,978 7,244,108 68.14 7,980,217 692,239 <br />,' I Capital Contribution 1,971,000 1,971,000 1,869,671 (101,329) <br />Equip Repl -Contribution 676,500 676,500 473,910. (202,590) <br />Operating Reserves 2,061,390 1,711,493 1,691,432 (369,958) <br /> <br />Total Operating Budget <br />:~ <br />71.80 $13,413,373 <br />$13,069,440 <br />76.54 $13,653,687 <br />$240,314 <br />j Funding: <br />`- ' Beginning Balance $2,161,787 $1,281,890 $2,127,327 ($34,460) <br />User Fees 11,700,000 11,700,000 11,200,000 (500,000) <br />Other 87,550 87,550 326,360 238,810 <br />Total Operating Budget Funding $13,949,337 $13,069,440 $13,653,687 ($295,650) <br />CAPITAL PROGRAMS BUDGET <br />SPRINGFIELD <br />Biosolids Mngt - Dewatering 0 709,180 0 NA <br />Biosolids -Poplar Plantation 2,172,459 2,519,096 2,549,096 376,637 <br />Biosolids -Sludge Main Access Vaults 0 0 100,000 NA <br />Biosolids -Groundwater Remediation 0 0 100,000 NA <br />%__) Lab Remodel 977,200 1,208,297 1,058,000 80,800 <br />Wet Weather Flow Monitoring 595,567 659,177 190,000 (405,567) <br />Pre-Design Study 2,000,000 2,000,000 900,000 (1,100,000) <br />Engine Gen.- Digester Gas Filter 0 0 300,000 300,000 <br />'~ ~ EUGENE <br />Equipment Replacement Purchases 402,372 459,072 609,299 206,927 <br />~ `j Major Rehab 456,000 586,000 495,338 39,338 <br />Major Capital Outlay 421,000 421,000 0 NA <br />Total Capital Projects $7,024,598 $8,561,822 $6,301,733 ($722,865) <br /> <br />Funding• <br />~~~ <br />r SDC Reserve <br />~. $2,656,700 $2,920,310 $1,788,000 ($868,700) <br />Equipment Replacement 823,372 880,072 609,299 (214,073) <br />Capital Reserve 3,544,526 4,761,440 3,904,434 359,908 <br />Major Rehab Reserve 0 0 0 NA <br />?__ Total Capital Projects Funding $7,024,598 $8,561,822 $6,301,733 ($722,865) <br />~ ,; Notes: * The Change (Inc/Decr) column compares the proposed FY 02-03 budget to the originally adopted FY <br />~, ', 01-02 budget column. <br />** The Amended FY 01-02 budget included a 1.0 FTE Civil Engineer increase in Springfiel d <br />r ;; Administration. The FY 02-03 budget increases by .10 Accounting Manager over the FY 01-02 <br />I amended budget. <br />l_ '' <br />*** The amended FY 01-02 budget included a .80 FTE Service Improvement Analyst reduction in Eugene <br />~ Wastewater Division Operations. The FY 02-03 budget increases by .25 FTE Billing Specialist, and <br />', 4.04 FTE formally budgeted and funded separately as a pass through from Chiquita Process Foods, as <br />compared to the amended FY 01-02 budget. <br />~~ <br /> <br /> <br />,' Page 20 FY 02-03 Budget <br />