Metropolitan Wastewater Management Commission Budget and Program Summary <br />CAPITAL PROGRAMS <br />The RWP budget includes several capital programs, including the Capital Improvements <br />Program (CIP), the Major Infrastructure Rehabilitation Program, and the Equipment <br />Replacement Program. The CIP consists of capital projects that are administered by the City of <br />Springfield as part of its contract responsibilities for MWMC. CIP projects typically provide for <br />new or expanded facilities and/or capacity~enhancements. The annual CIP budget is <br />administered by Springfield and is separate from the Operating Budget. <br />The proposed FY 02-03 CIP is funded by a combination of SDC's, contributions from the <br />', operating budget, and capital reserves. The proposed FY 02-03 CIP budget is summarized in <br />Figure 3 below, and described on pages 25-29. <br />Other capital programs, consisting of Major Infrastructure Rehabilitation Program and the <br />Equipment Replacement Program include capital projects/purchases that are administered by the <br />City of Eugene as part of its contractual responsibilities for MWMC. These programs provide <br />for major construction, repairs, and purchases necessary to maintain functionality, lifespan, and <br />effectiveness of existing facility assets and capacity. The proposed FY 02-03 budget for these <br />capital programs is summarized in Figure 3 below, and itemized on the page 29. <br />FIGURE 3 <br />REGIONAL CAPITAL PROGRAMS <br />DESCRIPTION FY 02-03 PROPOSED BUDGET <br />Biosolids -Poplar Farm 2,549,096 <br />Sludge Main Access Vaults 100,000 <br />Groundwater Remediation 100,000 <br />Lab Remodel 1,058,000 <br />Wet Weather Flow Monitoring 190,000 <br />Pre-Design Study " 900,000 <br />Engine Gen:=Digester Gas Filter 300,000 <br />Total (Not Included in Operating Buget) $5,197,096 <br /> <br />Other Capital Programs (Eugene Operations) <br />Equipment Replacement $609,299 <br />Major Rehabilitation 495,338 <br />Major Capital Outlay _ p <br />Total (Not Included in Operating.Budget) $1,104,637 <br />Page 18 FY 02-03 Budget <br />~, <br />