New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2004-05 Regional Wastewater Budget and CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2004-05 Regional Wastewater Budget and CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:06:08 AM
Creation date
6/1/2009 12:28:11 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Budget & CIP
Document_Date
6/30/2005
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WILLAKENZIE PUMP STATION EXPANSION <br />_Facility Process Component <br />Collection System Pump Stations <br />$6, 340,.704 <br />Total Cost <br />Costs EXPEND- 2004.05 2005-06* 2006-OZ 2007-08 2008-09 TOTAL <br />ITURES <br />Design & Engineering 634,070 <br />Construction 5 706 634 634,0 <br />TOTAL 0 0 6;340704 p 5 706,6 <br />FUNDING SOURCE 0 0 6,340,7 <br />;apital Reserve 3,931,236 <br />mprovementment SDC Reserve , ,,,,~ .tee 3,931,2 <br />I V IHL 0 0 6,340;704 `~"~ Voo <br />0 0 0 6 <br />340 <br />704 <br /> , <br />, <br />Inflated from FY 04-05 costs at 2.8% per year (Engineering News Record factor) <br />PROJECT: Willakenzie Pump Station Expansion <br />DESCRIPTION: Add four, 14-mgd pumps to increase capacity from 80 to 135 mgd. <br />JUSTIFICATION: Additional pumping capacity is required to increase total influent pumping capacity to 277 <br /> mgd. <br />PROJECT DRIVER: Systematic elimination of sanitary sewer overtlows by the year 2010. <br />PROJECT TRIGGER: Collection system computer model estimates the current wet weather peak flow to plant to <br /> be 264 mgd. Overall existing peak flow capacity is 175 mgd so there is already a capacity <br /> deficit. <br />TYPE OF PROJECT: 100% Capacity <br />ESTIMATED PROJECT COST $6,000,000 <br />(2004 Dollars): <br />INFLATED PROJECT COST $6,340,704 <br />(2006 Dollars): <br />PHASING: Budgeted for FY 2005/06 <br />Page 53 FY 04-OS BUDGET AND CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.