Metropolitan Wastewater Management Commission Capital Improvements Program <br />'' '~ REGIONAL WASTEWATER PROGRAM <br />CAPITAL PROGRAMS <br />The FY 04-OS CIP budget is included in the administration portion of the RWP budget. The five- <br />year CIP begins on page 46. For the past several years, the five-year CIP has been primarily <br />composed of projects identified by the 1997 Master Plan, the 1997 Biosolids Management Plan, and <br />the WWFMP, 2001. The WWFMP provided the basis for wastewater treatment facility capital <br />improvements related to peak wet weather flow. In order to determine design parameters and to <br />identify the impacts of these projects on other treatment facility processes, a Wet Weather Flow Pre- <br />Design Project was initiated in FY 02-03. This project evolved into a comprehensive Facilities Plan <br />in 2003 to address the increased regulatory requirements contained in the new NPDES wastewater <br />discharge permit. <br />The current Regional Wastewater Facilities are based upon the "208 Study" performed in the late <br />1970s and have been in operation for nearly 20 years. Therefore, a comprehensive Facility Plan has <br />been undertaken. The 2004 Facilities Plan identifies several process areas that are at or near <br />capacity and identifies projects that will assure that the Regional Wastewater Facilities have <br />sufficient capacity to meet the needs of current and future users through the year 2025. The FY 04- <br />05 CIP budget is composed of projects carried over from previous years and projects identified in the <br />2004 Facilities Plan. CIP project summaries are provided below. The FY 04-OS CIP is funded using <br />a combination of Capital Reserves and SDCs. <br />Other capital programs, including the Equipment Replacement Program, Major Capital Outlay <br />Program, and Major Rehabilitation Program are included in the operations portion of the RWP <br />budget. The basis for planning in these capital programs involves an annual evaluation by <br />operations staff of major assets, where they are in their projected life cycles, <br />performance/maintenance records, etc. FY 04-OS funding for these programs will come from the <br />Equipment Replacement Reserve and Capital Reserve. Itemized lists of, and budgets for, Equipment <br />Replacement purchases, Major Infrastructure Rehabilitation projects, and Major Capital Outlay are <br />included on pages 30-31. <br />CAPITAL IMPROVEMENT PROJECTS <br />Carryover Projects <br />These projects represent a continuation of previously budgeted activities. <br />Biocycle Farm Land Application and BMF Reclaimed Water Supply <br />FY 04-OS Capital Budget = $2,100,000 <br />During FY 03-04, the project scope was modified to incorporate several projects which had been <br />budgeted separately. 'They included: (1) the addition of a reclaimed water conveyance system to <br />serve both the dewatering facility and the Biocycle Farm; (2) the connection of the reclaimed water <br />line to the biosolids sludge force main to allow mitigation of struvite buildup; and (3) the addition of <br />sludge strain presses. <br />Completion of the first 190-acre phase of Biocycle Farm was completed in the spring of 2004. <br />(_ ! Construction work on the reclaimed water pipeline and related pump station along with phase two of <br />Biocycle Farm, are budgeted in FY 04-OS budget year. <br />,~ <br />I, <br />Page 26 FY 04-OS BUDGET AND CIP <br />---, <br />