New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Eugene/Springfield Water Pollution Control Facility 1984-1991
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Eugene/Springfield Water Pollution Control Facility 1984-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 11:34:05 AM
Creation date
6/1/2009 12:27:55 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
Water Pollution Control Facility
Document_Date
7/31/1993
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section I: T~c~cnr. SBxvicss <br />Page 65 <br />PLANT WASTEWATER <br />The laboratory provides all the analytical monitor- <br />ing required for the National Pollution Dischazge <br />Elimination System (NPDES) permit, as well as <br />any additional testing requested by the operations <br />staff. The permit is issued by the Department of <br />Environmental Quality pursuant to ORS 468.740 <br />and the Federal Clean Water Act. Each day, 24- <br />hourcompositesamples azecollectedatfourpoints: <br />pretreatment (immediately following the <br />comminutors), primary effluent, secondary efflu- <br />ent, and final effluent. Testing schedules have <br />varied somewhat over the years, but the following <br />is a typical schedule. <br />INFLUENT <br />Test Type of sample Frequency <br />pH grab daily <br />BOD 24-hour composite every other day <br />TSS 24-hour composite daily <br />Metals (Ag,As,Cd,Cr,Cu,Pb, 24-hour composite quazterly, for seven days <br />Ni,Hg,Se,Zn) <br />Total Phenols 24-hour composite quarterly, for seven days <br />Total Cyanide 24-hour composite quarterly, for seven days <br />PRIMARY AND SECONDARY EFFLUENT <br />Test Type of sample Frequency <br />BOD 24-hour composite every other day <br />TSS 24-hour composite daily <br />FINAL EFFLUENT <br />Test Type of sample Frequency <br />pH grab daily <br />Residual Chlorine grab daily <br />Fecal Coliform grab two per week <br />BOD/CBOD 24-hour composite every other day <br />TSS 24-hour composite daily <br />Metals (Ag,As,Cd,Cr,Cu,Pb, 24-hour composite quarterly, for seven days <br />Ni,Hg,Se,Zn) <br />Total Phenols 24-hour composite quarterly, for seven days <br />Total Cyanide 24-hour composite quarterly, for seven days <br />DIGESTERS <br />Test Type of sample Frequency <br />Alkalinity Composite two per week <br />(one sample per shift) <br />Volatile Acids monthly <br />Total Solids two per week <br />Volatile Solids two per week <br />
The URL can be used to link to this page
Your browser does not support the video tag.