New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Skinner Butte Park Master Plan
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Skinner Butte Park Master Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 1:14:22 PM
Creation date
6/1/2009 12:27:35 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
POS
PWA_Project_Area
Miscellaneous
PW_Subject
Skinner Butte Park
Document_Date
1/31/2002
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br /> i <br /> I, <br /> i <br /> i <br /> Top Ten Priorities for Skinner <br /> Butte Park <br /> The Implementation Plan portion of the <br /> ~ ,,~k Skinner Butte Park Master Plan (see <br /> ' ` ~ Chapter 6, Implementation Plan) contains <br /> ~ a complete listing of proposed project <br /> M priorities. The following are the top ten <br /> j ~ . priorities to be funded by the 1998 Parks <br /> and Open Space bond measure (Measure <br /> 20-03). L <br /> , ~ <br /> ~ 1. Initiate and execute an in-depth habitat ~ <br /> ' ~ =a~' inventory study for the butte and the U <br /> ' ~ .,i~? , ~ ~ s ~ ~ " aver habitats and connections. <br /> h <br /> 2. Develop and implement a control plan <br /> ~~S~Q~"~''"I~c1V~>~c31~~1~F ~[lC~ ~l~~MfS, to remove targeted invasive plant <br /> '~:~~j ,4nother hign priority for Parks and ~ species, and develop a general action <br /> ~ open space bond measure funding plan for removal of all invasive species <br /> is the restoration of native upland <br /> prairie and preservation of significant <br /> ~ views from skinner Butte. 3. Redevelop the trail system on Skinner <br /> Butte <br /> { <br /> 4. Create aRiver-Bottom Interpretive Trail <br /> ~I <br /> ~ ' 5. Convert certain mixed successional <br /> shrub and forest areas on the south, <br /> east and west slopes of the butte to <br /> native upland prairie <br /> YI <br /> x <br /> C <br /> ~ ~ 6. Convert certain areas of lawn to native <br /> ~ ~ Dui' ~ ~ ~ wet prairie, where possible, to serve as <br /> , ~ ~ ~ potential water quality enhancement or <br /> ' . 'r ~ ~ ~ infiltration areas <br /> . <br /> K <br /> , ~ 7. Provide irrigation to the historic <br /> r <br /> ~'t < ~ ~ ~ ~ W f~ ' community farm site <br /> ~ ~ >?~Y ~r"ar~'.r..~t``:% 8. Develop viewshed management <br /> • -„W ~ ' ~ ~ parameters and restore viewshed <br /> • ~ ~ ~ i ` 9. Design and install interpretive signage <br /> ' " _ for cultural history, including the story <br /> of the Kalapuya <br /> ~ ~ ~ <br /> 10, Design and install interpretive signage <br /> ski r>f n~;~ ~~L~ ~>f"~3t1 <br /> qtr for natural history <br /> Large projects like the Skinner Butte <br /> I Promenade, although a high priority <br /> <br /> II <br /> ' and very important for the function of <br /> the park and downtown Eugene, will <br /> , need additional funding sources. <br /> i Skinner Butte Park • Master Plan 2001 17 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.