i <br /> " Skinner Butte Master Plan Strategies <br /> I 4.3 PLAYGROUND: Fundamentally 6.1 SKINNER BUTTE PROMENADE: <br /> 1 i redevelop the existing playground as a E~lore the development of a clear and <br /> citywide attraction convenient pedestrian promenade from <br /> downtown via the summit of Skinner <br /> 4.4 WEST END: Redevelop the west end of Butte and Lamb Cottage to the <br /> the park for education, interpretation Willamette River. <br /> and recreational use in keeping with <br /> the character and unique aspects of the 6.2 TRAIL SYSTEM: Construct a clear trail ~ <br /> park. system for the butte and the river ~ <br /> cd <br /> 'i_._ corridor. ~ <br /> 4.5 LAMB COTTAGE: Revitalize Lamb <br /> Cottage and surrounding area to 6.3 EMPHASIZE ALTERNATIVE <br /> support group events and provide an TRANSPORTATION: Emphasize and <br /> anchor for the Skinner Butte encourage alternative transportation <br /> Promenade. modes within the park, as well as to <br /> and from the park. <br /> 4.6 OPEN SPACE: Designate adequate <br /> open space within the park 6.4 PARKING MODIFICATIONS AND <br /> MANAGEMENT: Maximize use of <br /> 11 _ 4.7 LANDSCAPE AND IRRIGATION: existin aved areas while minimizin <br /> 9P 9 <br /> i Address the general condition, construction of new parking. <br /> maintenance and development of <br /> ' landscape areas throughout the park. 6.5. CHESHIRE AVENUE MODIFICATIONS: <br /> Modify existing street to support key <br /> 4.8 LIGHTING: Provide for adequate .park values. <br /> lighting in the park. <br /> 6.6. MULTI-MODAL CONNECTIONS: <br /> 4.9 RESTROOMS: Provide adequate Enhance multi-modal entrance areas <br /> sanitary facilities in the park. and connect them visually to <br /> downtown and adjacent <br /> 4.10 COWMNS: Improve and maintain the neighborhoods. <br /> Masfer plan <br /> j ~ j columns as a public climbing area. <br /> strategies are ~ 6.7 I-105 UNDERPASS: Redevelop this <br /> fleshed out by a fist 4.11 MEMORIALS: Carefully evaluate the area for pedestrian and bicycle access <br /> ~ of prioritized introduction of new personal or public between the west Whiteaker <br /> actions in the memorials within Skinner Butte Park neighborhood, Owen Rose Garden and <br /> Implementation Skinner Butte Park. <br /> plan 4.12 INTRUSIONS: Identify and mitigate <br /> physical intrusions impacting 6.8 DISABLED ACCESS: Work towards <br /> (see Chapfer 5) recreation and aesthetic values within ADA-compliant access to all key park <br /> the park. facilities. <br /> I, 5. Strategy: Develop and apply design 6.9 EQUESTRIAN ACCESS: Consider <br /> standards for all built fecllitieS and access by horses as a unique mode of <br /> infrastructure that reflects and transportation reflecting and promoting <br /> emphasizes the park's historic the park's unique historic values <br /> context. 7. Strategy: Implement measures to <br /> 6. Strata Im rove and maintain improve public safely within Skinner <br /> gy' p Butte Park. <br /> " ! pedestrian, bicycle and vehicle <br /> traffic circulation patterns to g, Strategy: Facilitate follow-through <br /> - , emphasize alternative transportation, and continuity of master plan goals. <br /> ~ acces~bility and safety. <br /> <br /> T-i . Skinner Butte Park • Master Plan 2001 15 <br /> <br />