i <br /> j <br /> a~02 <br /> P <br /> See page 20 for definitions o ?o f <br /> Implementation Plan 5~oa2as~~ c~y~o2 <br /> ACTION ACTION VOL. POSSIBLE COST I <br /> <br /> Skinner Butte Park Master Plan PRIORITY TYPE OPPS. NOTES PROJECT STAGES TIMELINE FUNDS ESTIMATE <br /> D. Design and construct parking morftfieations to Cheshire <br /> 3 j * * * * 2010 TBD $125,000 i <br /> nvenue <br /> i <br /> 1. In conjunction with modifications to Cheshire Ave., add angle parking, using existing street width, to area south of Lamb Cottage to increase parking supply in this area while <br />narrowing travel lane width to <br /> :minimum (10 feet). j <br /> ~2. Define and stripe parallel parking spaces along Cheshire Ave. Use extra street width to include new parallel parking where extra width safely allows. <br /> '3. Use mountable-curb parking space definition as recommended for traffic calming, apply to both angle and parallel parking areas <br /> E.~Redevelop parking area on butte summit ~ See Action See Action 4.1 See Action ~ <br /> 2 j 4.1 4.1 <br /> i <br /> i 1. Try to maintain same number or more parking spaces in equal area (including code requirements) <br /> ~2. Add planting islands as required by code ' <br /> ~3. Stripe spaces <br /> €4. Reduce travel lane width to minimum to allow wider pedestrian promenade and overlook area south of lot <br /> 5. Provide for several park-and-view spaces with unobstructed views to the south (consider railing height, placement of park furnishings, etc.) <br /> 6. Explore options for adding aturn-around for cars at the east end of the lot <br /> i7. Explore options for bus parking <br /> F.~Ezplore waye to ImprovF parking and putaic access at the See Action See Action See Action ~ <br /> south Skinner Butte trail head and the Shelton-~4cA4urphcy- ~ j 6.1.G 6.1.G 4.1 <br /> Johnson House at the 3n)r4th Connector <br /> 1. Consider inter-departmental pursuit of negotiation with current property owners to purchase land between the existing Shelton-McMurhpey-Johnson House property and the 3rd/4th Connector <br />for <br /> ;redevelopment as parking and improved access to the SMJ House and south Skinner Butte trail (as well as the proposed Skinner Butte Promenade). <br /> i2. See the Shelton-McMurphey-Johnson House Historic Landscape Master Plan for further recommendations <br /> i3. See the Satre, Associates concept plan for parking at the south trail entrance for potential parking development in this area in lieu of property purchase alternatives <br /> ~ <br /> C CHESHIRE AVENUE MODIFICATIONS: Design and Values include emphasis on pedestrian <br /> 6.5 construct modifications to existing street to promote and bicycle use, connecting butte and <br /> overall values of park, neighborhoods with the north half of the <br /> park and the river, and promoting safety i. <br /> through reducing speed of through traffic. <br /> A. Narrow lane width to 10' maximum for each travetdirection See Draft Master Plan drawing for <br /> (20' total) on nc~ahire Ave. through the. p ~rl. be hve~cn conceptual guidelines * * * * ~ <br /> P~,'ashington ';tre ~t and the northern edge of the parking let 3 j 2010 TBD $20,000 <br /> nor[h r,f the Campbell Senior Center ~~i <br /> i 1. Expand sidewalks or planting areas where narrowing of travel lane frees up space <br /> 2. Use low, mountable curb for parallel and angle parking along street ( <br /> B..Add raised crosswalks at requiar intervals to slow#raffic and See Draft Master Plan drawing for <br /> I prompt a Gnnne(~ion hFt been thF butte an 1 th ~ rig er es well 3 j Conceptual guidelines * * * * 2010 TBD ~ <br /> as hct,~~en ncighborhnrds nest of the butte and the park $20,000 <br /> I <br /> I <br /> C. Consider using a textured material for the travel surface Consult with Public Works Engineering ,G <br /> 3 j and Transportation to determine textured * * * * 2010 TBD $20,000 <br /> surfaces <br /> D. Set a speed limit of 15mph through the park 3 POL 2005 <br /> E. Look at possibilities for allowing right-hand turns into Skinner Traffic modification not part of Cheshire <br /> Butte Loop from north-bound lane of Lincoln Street. 3 j Street modifications 2010 <br /> I <br /> Imp; ation - , ~ 1H - - - <br /> ~ ' ~ ~ _,.'Janua. ~2 <br /> <br />