New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Skinner Butte Park Master Plan
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Skinner Butte Park Master Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 1:14:22 PM
Creation date
6/1/2009 12:27:35 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
POS
PWA_Project_Area
Miscellaneous
PW_Subject
Skinner Butte Park
Document_Date
1/31/2002
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br /> - <br /> i <br /> _ ~ _ - _ t__. _ w_.~_ <br /> P~ <br /> See page 20 for definitions ~ c~ ~2~ <br /> oa a yc~ <br /> Implementation Plan ~ 2~ <br /> yu QS o`` <br /> <br /> Skinner Butte Park Master Plan ACTION ACTION VOL. POSSIBLE COST <br /> PRIORITY TYPE OPPS. NOTES PROJECT STAGES TIMELINE FUNDS ESTIMATE <br /> A. Create a safe and attractive pedestrian promenade within the 2 CR i <br /> character of the park and design standards <br /> 1. Provide adequate, pedestrian-scale lighting ~ <br /> 32. Provide clear, defined entry points and clear intersections <br /> 13. Remove dense underbrush between 3' and T height within a minimum of 20' on either side of path to create safety corridor through forested areas <br /> ~4. Provide clear way finding signs or markers <br /> €5. Use materials and craftsmanship in keeping with the historic context of the park <br /> B. Create gateways at major entry points at the summit, north 2 CR <br /> butte, Lamb Cottage and the Willamette River <br /> C. Create a sense of continuity, quality, safety and interest for the 2 CR <br /> promenade j <br /> D. r <br /> tive_ ~do~ In 2 RE * * * ~ 2010 TBD TBD <br /> 1. Option A: explore the possibility for a pedestrian crossing at- <br /> €grade ~ <br /> '2. Option B: provide a pedestrian underpass <br /> `3. Option C: provide a pedestrian overpassk <br /> E, ~ l <br /> co~thErt'fY~F ! 2 ~ ~ ~ * * 2010 TBD TBD <br /> I <br /> F. pevetop a p~.destrain and dlc~~~r_Ie path conncctiny the train Blend materials and style of existing CCC <br /> ~fafinn area with the southern foot of Skinne r Butte stonework on south side of Cheshire with * * * ~ <br /> ~ I urban infrastructure in 5th street/ train 2010 TBD $200,000 <br /> station area <br /> G. Develop a main entrance area at the southern io:~t of Skinner Match materials and style of existing CCC <br /> Butte to serve r~s a gateway, including parking. lighting, park 2 I stonework on south side of Cheshire * * * * 2010 TBD $100,000 <br /> signage and [rail information (see 6 -1.F_l <br /> 1. Consider the merits of existing planning commissioned by Rotary Club and produced by Satre Associates with greater emphasis on pedestrian use ~ . <br /> E2. Consider other options that integrate the SMJ house to the extent possible, with an emphasis on alternative transportation and pedestrian use. <br /> H.~Deveiop a stone stairway ascending the soih slope of Skinner Generally follow route of existing path. <br /> Butte from thF~ ard~ath connector to the summit evFdook area Path may be widened and defined with <br /> 2 j appropriate materials in a style similar to * * * * 2010 TBD $800,000 <br /> CCC stonework on south side of Cheshire <br /> 1. Develop a pathway from the summit overicok area, down the Generally follow route of existing path. <br /> north side of Skinner Eutte to the historic picnic area directly Path may be widened and defined with <br /> south of t_arnh Cottage 2 j appropriate materials in a style similar to * * * ~ 2010 TBD $175,000 <br /> CCC stonework on south side of Cheshire <br /> J. Develop a gateway to the Skinner Butte Pranenade at the Match materials and style of existing CCC <br /> histnnr, picnic area south of CP~eshire, including wayfinding 2 j stonework on south side of Cheshire * * * 2010 TBD $25,000 <br /> and interpretive materials' <br /> K. (:e-align and re-build existing CCC stone stairr~ay to create ~ <br /> axis v~ith Larnb Cottage 2 I * * 2010 TBD $35,000 ' <br /> i <br /> i <br /> Implementation Plan 13 of 20 January 2002 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.