Table 4 <br />DA-22 Basin Seasonal RDII Flow Reduction <br /> Dry Wet <br /> Weather Weather Wet Weather <br /> Flow Flow Rainfall Flow Volume/ <br /> Total Measured Volume Volume Accumulation Rainfall <br /> Flow Volume MG MG MG inches MG/inch <br />re=Rehabilitation <br />Oct 24, 95 to Jan 16, 96 31 14 18 17.0 1.0 <br />Post-Rehabilitation <br />Nov 1, 01 to A r 12, 02 56 28 28 36.9 0.8 <br />Oct 31, 02 to Feb 20, 03 57 19 38 29.3 1.3 <br />Figures 14 and 15 show a portion of apre-rehabilitation wet season total measured flow and a <br />portion of apost-rehabilitation wet season total measured flow for the DA-22 Sub-basin. <br />6 <br />4 <br />3 <br />8 <br />a 0 <br />} e <br />~ 2 . ~ <br />e. ° ~ n e <br />v A $ <br />°' 8° ~ <br />0y • . ~ •~ <br />~ ro`. $ <br />M a $ °P e e.g a~. ~°~ <br />'i ~s i ~ ; s t ~ o <br />o ~ <br />Nov-95 Dec-96 Jan-96 <br />Date <br />Figure 14 -Sub-basin DA-22 pre-rehabilitation measured flow and rainfall <br />0 <br />02 <br />0.4 <br />0.6 <br />V <br />0.6 ~ <br />i <br />C <br />1 <br />1.2 <br />1.4 <br />26 <br />