PREFACE <br />"We plan strategically and we work from our plans" <br />The development and use of this Facilities Master Plan embody the above message from the <br />City's values statement. The Maintenance and Parks and Open Space Divisions of Public <br />Works have successfully utilized this plan and aim to be proactive in planning for the future. We <br />have considered our structural and personnel needs in developing and updating this Facilities <br />Plan. <br />This Facilities Planning document should be viewed as dynamic and flexible: a document that <br />has the flexibility to be altered as different needs arise, yet thorough enough to be used for <br />"! budgeting, project planning, and program management for the divisions served by the facility. <br />Ii <br />Kurt C rey <br />Director of Public Works <br />Date <br />,` <br />~" „:,~,pirectoro Public-l~/a~~s: Kurt Core <br />Ma r~te`~ance Directtc=~ Hobert J. Lankston ==~ <br />P ~,.s d e~;~ ac~,Diretor: Joky n M~dii , <br />Prepared by: <br />Surface Operations Section <br />Eric Johnson, Surface Operations Manager <br />Jackie C. Hallett, Surface Technical Team Supervisor <br />Wayne Masoner, Surface Maintenance Technician <br />January 2004 <br />ii <br />