New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Roosevelt Yard Facilities Master Plan (2)
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Roosevelt Yard Facilities Master Plan (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 1:09:59 PM
Creation date
6/1/2009 12:27:18 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Maintenance
PWA_Project_Area
Minutes
PW_Subject
Roosevelt Yard
Document_Date
1/31/2004
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BUILDING SEVENTEEN <br />Building #17 is a warehouse used to store Traffic Operations materials and supplies. <br />BUILDING EIGHTEEN <br />Building #18 is used by both Divisions to store misc. operational vehicles. One section provides <br />an open bay parking while the other section provides heated bays. <br />BUILDING NINETEEN <br />Building #19 is used by the Traffic Operation section for material storage, misc. paint and <br />thermal supplies and parking. <br />BUILDING TWENTY <br />Building #20 is used for storing 10 yard dump truck and provides storage for the winter season <br />'; sanding equipment. <br />~_ ~ <br />I; <br />BUILDING TWENTY ONE <br />Building #21 is a temporary modular building with approximately 420 sq. ft. which primarily <br />' houses the Wetlands supervisor (room # 001), two staff (#'s 002 & 004) and one seasonal staff <br />(#003) from the Open Waterways Work Unit. <br />~~ <br />i' ~ Facilities Master Plan -January 2004 <br />III -12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.