BUILDING TWELVE <br />Building #12 houses the Tree Maintenance crew, Parks Volunteer Program, the Medians and <br />Landscape work unit and restrooms. <br />TREE MAINTENANCE CREW <br />The Tree Maintenance crew is located in Building #12. The four-member crew shares a <br />workspace (room #001). <br />PARKS VOLENTEER PROGRAM <br />This program has one FTE. It is located in Building #12 and occupies one (room# 005). <br />MEDIAN AND LANDSCAPE <br />The Medians and Landscape work unit is located in Building #12 with a few exceptions. There <br />are 13 FTE assigned to this work unit. All but three FTE's report directly to this facility each shift. <br />The supervisor has an office (room #004) while the crew shares a common workspace (room <br />#003). <br />BUILDING THIRTEEN <br />Building #13 houses laundry and uniform storage areas as well as welding and miscellaneous <br />--1 materials storage. <br />BUILDING FOURTEEN <br />Building #14 primarily houses the Radio Maintenance work unit in Fleet Services. This work unit <br />has 5 FTE assigned to this work unit (room # 001 & 006). The building also has a second floor <br />that is used for storage. There are future plans to expand this operation with 3 more FTE that will <br />.negatively impact this workspace area. <br />BUILDING FIFTEEN <br />Building # 15 primarily houses the Traffic Section that is made up of three work units: Traffic <br />Technical, Traffic Maintenance and the facility Safety Coordinator (located in Bldg. # 6). This <br />building also houses the Traffic Section Manager, and front office area that has been temporarily <br />--' reconfigured into office cubicles, storage, break room and restroom facilities. <br />TRAFFIC <br />Building #15 provides offices for 3 supervisors (room #'s 004, 014 & 015), shops (room #'s 005 <br />& 021) and facilities for work crews, and storage areas (room #'s 006 & 022). Building #15 is <br />no longer adequate for all the fabrication work and repair activities, crew workstations and office <br />needs, and storage. Additional space is necessary for the current work activities of Traffic <br />Operations section. Along with the remote Safety Coordinator position, the traffic technical <br />workgroup currently has five staff, including on temporary position, housed in Building 2. <br />Building 15 does not have an appropriate meeting or conference room area. <br />STORAGE <br />The second floor mezzanine consists of unimproved space for misc storage (room # 023). <br />BREAK ROOM <br />The break room (room # 012 & 013) has been converted to office space and is used by both <br />Building 15 and Building 2 staff. <br />RESTROOMS <br />Building 15 contains restroom facilities (room #'s 010 & 011). <br />--, BUILDING SIXTEEN <br />Building #16 is used to provide covered parking and material storage for the Traffic Operations <br />vehicles. <br />Facilities Master Plan -January 2004 <br />III - 11 <br />