New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Roosevelt Yard Facilities Master Plan (2)
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Roosevelt Yard Facilities Master Plan (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 1:09:59 PM
Creation date
6/1/2009 12:27:18 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Maintenance
PWA_Project_Area
Minutes
PW_Subject
Roosevelt Yard
Document_Date
1/31/2004
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
OPEN WATERWAY SUPERVISOR AND STAFF <br />The Open Waterway Supervisor and three staff on this work team are located in Building #2. <br />The supervisor is located in office #033, while each staff has an assigned cubical (#019, 021 & <br />031). <br />SURFACE TECHNICAL SUPERVISOR AND STAFF <br />The Surface Technical Supervisor and five staff of the 8 FTE assigned to this work section are <br />housed in Building #2 and a portion of Building #3. The Surface Technical Supervisor has an <br />office (room #044), while each of the five staff resides in an office cubical (#036, 037, 038, 039, <br />040 & 031). Building #2 also houses the `tool crib' stockroom, tool check-out, and warehouse <br />purchasing counter (rooms #041 & 042). The Surface Technical work unit has three seasonal <br />staff during the summer months with limited designated space (room #043) thus creating <br />additional seasonal workspace demands. <br />BUILDING THREE <br />Building #3 primarily houses staff from Surface Technical and Open Waterway, restrooms, Turf <br />--= and Grounds irrigation materials, supplies and parking. <br />SURFACE TECHNICAL STAFF <br />Two Surface Technical staff are located in Building #3. Staffs perform computer support for the <br />Roosevelt Yard. Each has a designated workspace (#016 & 017). <br />OPEN WATERWAY STAFF <br />- There are two Open Waterway Staff is located in Building #3. One staff shares computer <br />support for the Roosevelt Yard (#018). The second staff is in charge of the Stream Team <br />Program who has a private office (room #011). <br />MISC. <br />Restrooms (room #014, 012 & 009) <br />TURF AND GROUND MATERIALS, SUPPLIES AND PARKING <br />(room #001 - 007) <br />BUILDING FOUR <br />Building #4 is primarily used for storage for Fleet tires (002 - 009), traffic control signs (010) and <br />tools for the Parks Volunteer programs (001). <br />BUILDING FIVE <br />Building #5 has a combined use. It is primarily used to store vehicles (room #003 - 012), <br />irrigation materials and supplies (room #001 & 002) and has the Workout Facility (room # 013, <br />014 & 015) on the east end. <br />BUILDING SIX <br />Building #6 primarily houses the entire Sub-Surface Work Section, Surface Maintenance <br />Supervisor and crew, the entire Parks Maintenance Work Section, Safety Coordinator, copier <br />room, a partial kitchen and restroom facilities. <br />;; SUB-SURFACE WORK SECTION <br />The Sub-Surface Work Section is located in Building#6 and is made up of three work units: <br />Stormwater, Wastewater and Technical. The section manager has an office (room # 015). <br />. There are also three supervisory offices (room #021, 026 & 027) and two crew rooms. The <br />~' Stormwater crew is located in crew room #022, Wastewater crew is located in crew room #024 <br />and Technical staff is located in room #'s 012, 013 & 014. <br />Facilities Master Plan -January 2004 <br />III-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.